Longannet Electricity Generating Station

Building(S) (20th Century), Bunker(S) (20th Century), Cottage (19th Century), Power Station (20th Century)

Site Name Longannet Electricity Generating Station

Classification Building(S) (20th Century), Bunker(S) (20th Century), Cottage (19th Century), Power Station (20th Century)

Alternative Name(s) Longannet Power Station

Canmore ID 68087

Site Number NS98NE 40

NGR NS 9520 8530

NGR Description Centred NS 9520 8530

Datum OSGB36 - NGR

Permalink http://canmore.org.uk/site/68087

Ordnance Survey licence number AC0000807262. All rights reserved.
Canmore Disclaimer. © Bluesky International Limited 2025. Public Sector Viewing Terms

Toggle Aerial | View on large map

Digital Images

General oblique aerial view of the Forth with the power station in the distance, taken from the W.
General oblique aerial view of the Forth with the power station in the distance, taken from the W.General oblique aerial view centred on the town and power station with the power station adjacent, taken from the WNW.General oblique aerial view looking across the ash disposal site and remains of the colliery at Preston Island, towards Culross and Valleyfield, with the chimney of Longannet power station visible in the distance, taken from the ESE.View from Stewart Avenue, Bo'ness, looking North across the Firth of Forth to Longannet Power Station in Fife. This photograph was taken as part of the Bo'ness Urban Survey to illustrate the character of the School Brae Area of Townscape Character.General oblique aerial view of the Forth with Inch Island in the foreground and Kincardine on Forth in the distance, looking ESE.Interior general view. Boiler House. 198 foot level, Penthouse Area. This level - steam drum, top section of superheater and reheater areaInterior general view. Boiler House, 108 feet levelInterior general view. Turbine Hall from east looking towards Turbo Alternators Nos./Units 1 and 2.  H.P. (High Pressure) Heaters on leftInterior general view of Central Control Room. 275kV Control Panels date from 1967/68/69. Supply distribution boards. Semi automated and manual. ?Later console desk.Interior general view of Control Room. 275kV Control Panels date from 1967/68/69.Interior floor detail. Central Control Room. Logannet motif (symbolising chimney with four flues).Interior general view. Boiler House. Basement level. Condensers - 'mini-water treatment plant' stopped build up of impurities from circulated water (and seawater) in boiler tube.Interior detail. Diesel generator room. Control panels for generators 1 and 2General view taken from the north west. Sub-stationGeneral view of Absorber pipework from north. Three Flue Gas Desilpherization (FGD) pipes are on the left. On the right, seawater (coolant) main water pipecarying water towards seal pits and cooling water channel (north east part of site)General view of water channel from east. This channel cools the process water prior to its entering into the River Forth (behind the camera). Power station visible in backgroundGeneral view of power station from east. This area is man made from boiler ash.General view. Circulating Water Pump House from west. Water pipes distributing seawater from the CW pumphouse to the rest of the site.Interior general view of archive holding area, Bay 9  (former Mess Room)Interior general view of archive holding area, Bay 9 (former Mess Room)General view of coal stock area from north west. On right, conveyor originally fed by NCB Buffer Hopper (from Longannet Mine, closed 2002) and Vehicle Coal Discharge hopper. This area had been cleared of coal stocks by the time of survey.General view of Coal Control Tower from south west.General view of power station from north west. Coal Conveyor from coal handling area stocks entering Boiler House to be burnt to produce steam for the TurbinesTurbine Hall, Main and Reheat Steam Pipework, T4. Copied from Longannet Power Station Plant Details HandbookWater Treatment Plant, diagram, WTP1. Condensate Polishing Plant (CPP). Copied from Longannet Power Station Plant Details HandbookOblique aerial view.Aerial viewImage of photo album titled 'Longannet', Gen. Station No. 21, Station Area looking South EastImage of photo album titled 'Longannet', Gen. Station No. 39, Site road from Culross Road - looking SouthImage of photo album titled 'Longannet', Gen. Station No. 56, Station Area looking North WestImage of photo album titled 'Longannet', Gen. Station No. 61, South East Station AreaImage of photo album titled 'Longannet', Gen. Station No. 8, Station Area looking SouthImage from photo album titled 'Longannet', Generating Station No. 114, Culross Road and Site Road looking EastImage from photo album titled 'Longannet', Gen. Station No. 73, Station Area looking South EastImage from photo album titled 'Longannet', Gen. Station No. 74, Access Bridge AreaImage from photo album titled 'Longannet', Gen. Station No. 84, Station Area looking SouthImage from photo album titled 'Longannet', Gen. Station No. 93, Site RoadImage from photo album titled 'Longannet', Gen. Station No. 95, Station Area looking North WestImage from photo album titled 'Longannet', Gen. Station No. 130, A985 Dual Carriageway Looking EastImage from photo album titled 'Longannet', Gen. Station No. 145, Station Area Looking South-East (view 1)Image from photo album titled 'Longannet', Gen. Station No. 162, Site from Fordel Hill Looking South-EastImage from photo album titled 'Longannet', Gen. Station No. 176, Water Pipe from 2,000,000 Gallon Water Storage TankImage from photo album titled 'Longannet', Gen. Station No. 180, A958 Dual Carriageway Looking WestImage from photo album titled 'Longannet', Gen. Station No. 193, Nos. 3 & 4 C.W. Culverts Looking North-EastImage from photo album titled 'Longannet', Gen. Station No. 194, West Half of Main Building Looking SouthImage from photo album titled 'Longannet', Gen. Station No. 195, No. 2 Turbo Block Excavations Looking South-EastImage from photo album titled 'Longannet', Gen. Station No. 199, Main Building Area from Fordel Hill - Looking South-EastImage from photo album titled 'Longannet', Gen. Station No. 212, No. 1 Turbo-Block - Looking NorthImage from photo album titled 'Longannet', Gen. Station No. 221, Boiler House Column Foundations (looking East)Image from photo album titled 'Longannet', Gen. Station No. 227, Outlet Valves at Water Storage TankImage from photo album titled 'Longannet', Gen. Station No. 251, Switch House area viewed from Fordel Hill (looking East)Image from photo album titled 'Longannet', Gen. Station No. 266, No. 3 T/A Block Founds. viewed from Col. Row A. Looking South-WestImage from photo album titled 'Longannet', Gen. Station No. 280, Chimney Sub Base viewed from C.W. Pump House. (Looking North-West). Nos. 3&4 C.W. Culverts North-EastImage from photo album titled 'Longannet', Gen. Station No. 297, Main building area viewed from East Bund looking WestImage from photo album titled 'Longannet', Gen. Station No. 299, No. 1 Turbo Block Viewed from Col. Row A. Looking South-EastImage from photo album titled 'Longannet', Gen. Station 317, Plan view 1. Switch House area viewed from Fordel Hill (looking East)Image from photo album titled 'Longannet', Gen. Station 321, Plan view 1. North-West corner of main building area viewed from west road looking North-EastImage from photo album titled 'Longannet', Gen. Station 327, Contractor's Temporary Jetty looking South-EastImage from photo album titled 'Longannet', Gen. Station 329, No. 1 T/A looking North-WestImage from photo album titled 'Longannet', Gen. Station No. 354, South Bund of C.W. Pumphouse Excavations (looking East)Image from photo album titled 'Longannet', Gen. Station No. 367, Precipitator Foundations Looking South-West No. 2 UnitImage from photo album titled 'Longannet', Gen. Station No. 372, Pan View 4 East End of Site viewed from Railway Looking South-WestImage from photo album titled 'Longannet', Gen. Station No. 374, Pan View 2 (Contractor's Batching Plant) viewed from Railway Looking South-EastImage from photo album titled 'Longannet', Gen. Station No. 378, Pan View 3 Main Building Area viewed from East Road (looking West)Image from photo album titled 'Longannet', Gen. Station No. 382, Pan View 2 Erection of Cranes viewed from West Road (looking East)Image from photo album titled 'Longannet', Gen. Station No. 387, Excavations for C.W. Pumphouse looking South-EastImage from photo album titled 'Longannet', Gen. Station No. 396, B/H Foundations No. 1 Unit (Looking West)Image from photo album titled 'Longannet', Gen. Station No. 399, West End of Site looking SouthImage from photo album titled 'Longannet', Gen. Station No. 408, Main Building Area Viewed from East Road looking WestImage from photo album titled 'Longannet', Gen. Station No. 419, No. 2 T/A Looking South WestImage from photo album titled 'Longannet', Gen. Station No. 432, Pan View 2 Main Building Area viewed from East Road (looking West)Image from photo album titled 'Longannet', Gen. Station No. 437, Pumphouse Excavations Looking NorthImage from photo album titled 'Longannet', Gen. Station No. 440, C.W. Outlet Culverts. Viewed from Seal Pit (looking South-West)Image from photo album titled 'Longannet', Gen. Station No. 444, No. 3 T/A Foundations (looking North-West) Pan View No. 1Image from photo album titled 'Longannet', Gen. Station No. 448, South East Area of Main Building (looking South-East)Image from photo album titled 'Longannet', Gen. Station No. 449, East side of Main Building (looking East)Image from photo album titled 'Longannet', Gen. Station No. 452, Main Building Foundations (viewed from East Road) pan view 1. Looking South-WestImage from photo album titled 'Longannet', Gen. Station No. 454, Main Building Foundations (viewed from East Road) pan view 3. Looking North-WestImage from photo album titled 'Longannet', Gen. Station No. 463, Central Building Area (looking North-East) pan view 1Image from photo album titled 'Longannet', Gen. Station No. 470, No. 3 T/A Foundations (looking North)Image from photo album titled 'Longannet', Gen. Station No. 498, Main Building Area viewed from East Road (looking West) Pan View No. 2Image from photo album titled 'Longannet', Gen. Station No. 503, C.W. Pumphouse Construction (looking North)Image from photo album titled 'Longannet', Gen. Station No. 507, C.W. Pumphouse Intake (looking West)Image from photo album titled 'Longannet', Gen. Station No. 512, Main Building Area Viewed from Railways (looking South-East) Pan View No. 2 Image from photo album titled 'Longannet', Gen. Station No. 514, Main Building Steelwork West Gable (looking South-East)Image from photo album titled 'Longannet', Gen. Station No. 516, Main Building Area Foundations viewed from No. 1 Unit (looking East)Image from photo album titled 'Longannet', Gen. Station No. 518, No. 3 T/A Foundations (looking North-West)Image from photo album titled 'Longannet', Gen. Station No. 524, East End of Rail Hopper Excavation (looking East)Image from photo album titled 'Longannet', Gen. Station No. 588, West End of Site. Pan View No. 1 from South-West corner of SiteImage from photo album titled 'Longannet', Gen. Station No. 590, Southern Area of Site. Pan View No. 3 from South-West corner of siteImage from photo album titled 'Longannet', Gen. Station No. L540, C.W. Inlet from Pumphouse (looking North)Image from photo album titled 'Longannet', Gen. Station No. L547, Main Building Area (viewed from Fordel Hill looking South-West) pan view no. 4Image from photo album titled 'Longannet', Gen. Station No. L559, Road Hopper Excavation (looking North)Image from photo album titled 'Longannet', Gen. Station No. 563, Main Building Steelwork - West gable (viewed from North-West)Image from photo album titled 'Longannet', Gen. Station No. 574, C.W. Pumphouse Construction (looking South) pan view no. 1Image from photo album titled 'Longannet', Gen. Station No. 580, North-West corner of Turbine House (looking North-West)Image from photo album titled 'Longannet', Gen. Station No. 594, West Area of Site. Pan View No. 4Image from photo album titled 'Longannet', Gen. Station No. 599, South-East of main building area. Pan view No. 2 from North-East corner of siteImage from photo album titled 'Longannet', Gen. Station No. 611, No. 3 T/A Foundations (looking South) pan view No. 1Image from photo album titled 'Longannet', Gen. Station No. 612, No. 3 T/A Foundations (looking South) pan view No. 2

First 100 images shown. See the Collections panel (below) for a link to all digital images.

Administrative Areas

  • Council Fife
  • Parish Tulliallan
  • Former Region Fife
  • Former District Dunfermline
  • Former County Fife

Archaeology Notes

NS98NE 40 centred 9520 8530

Longannet Power Station [NAT]

OS (GIS) MasterMap, April 2010.

For (integral) Longannet Colliery (centred NS 9450 8625), see NS98NW 65.

Not to be confused with (former) Kincardine Power Station (Kincardine Generating Station), centred at NS 9250 8810, for which see NS98NW 61.00.

Built 1966, by Robert Matthew, Johnson-Marshall & Partners, who also built Cockenzie Power Station (NT37NE 4).

J Gifford 1988

Site recorded by Maritime Fife during the Coastal Assessment Survey for Historic Scotland, Kincardine to Fife Ness 1996.

Activities

Standing Building Recording (January 2008)

NS 9499 8563 A desk-based assessment and a Level 2 standing building survey were undertaken in January 2008 on Longannet Power Station, Kincardine-on-Forth. The aim of the work was to record the remaining upstanding structures within the site boundary of the Proposed Biomass to Energy Plant. The structures consist of seven buildings and bunkers associated with WW2 defences and a small single-storey cottage with two outbuildings, which appear to date from the mid 19th century.

The work confirmed that little is known about the origins of Newpans cottage and the renovations carried out to the main structure. It is unclear whether the ancillary structures next to the cottage are also original, as the OS maps do not show a clear footprint of the site’s development. The remains of the munitions bunkers survive, but many of the original features have been removed and the structures have been vandalised.

Two of the structures next to the munitions bunkers were built later, as they sit over the earth banks that would have re-enforced the blast walls. Two of the structures are modern and of no architectural merit or historic value.

Archive: RCAHMS

Funder: Scottish Power

Kirsten Mckee (Jacobs UK), 2008

Field Visit (July 2016)

NS98NE 40 (NS9520 8530)

Longannet Power Station, Alloa, Fife

See also illustrated version: Longannet Electricity Generating Station Summary (file: WP00004474)

Summary record compiled as a result of a photographic survey carried out by Architecture and Industry, Survey and Recording Section, Heritage Directorate, HES, July 2016.

Background

The largest of its kind in Europe when it was completed, Longannet was a thermal power station using coal to generate electricity. It was the largest generator of power in Scotland prior to its decommissioning on the 24th March 2016. It occupied an 89-hectare site on the north side of the Firth of Forth (partly on land reclaimed from the Firth of Forth using ash from the nearby Kincardine Power Station). (1)

The foundations of the power station run to 270 000 cubic metres of concrete. Most foundation work took place at the east end due to the dip in the rock. Large bore holes were created into which the concrete was poured. The main building contained 35 000 tonnes of steel including specialist steels to support the weight of the boilers (11 000 tonnes each). The lattice girder in the boiler suspension steelwork weighed in at 225 tonnes and carried a load of some 6 000 tonnes. (2)

Longannet Power Station came on line in 1969 although the planning, design and build had begun many years before (building had begun in 1961) and had a projected 30 year lifespan. It began to generate electricity in 1970 and by 1973 was fully operational. It was designed by the architects Robert Matthew, Johnson and Marshall and Partners and the consulting engineers were Mertz and McLellan. (3) It was operated by the South of Scotland Electricity Board (1973-1991) and then by Scottish Power (a subsidiary of Iberdrola) after privatisation of the UK electricity industry in 1990. (4)

Longannet was built with a capacity of 2400MW (although in reality the capacity was 2304MW) and represented more than half the generating ability capacity of all of the South of Scotland Electricity Board's other stations. Longannet produced 9,525 GW hours of electricity in 2012. (5) This was enough electricity for 2 million households.

Work on the construction of the access road to the station and on the excavations for the foundations of the main building was begun in January 1964. (6) The main building was 300m in length by 150m in width, rising to a height of 75m. The chimney was comprised of four 183m flues encased in a concrete windshield. (7)

Longannet Power Station was supplied by the Longannet Mine until 2002. The incoming coal was received in a system of three hoppers. Two of these were originally for coal from Longannet Mine and the third for the small amount arriving by road in the 1970s. Latterly coal was mostly supplied from abroad by ship via the British Steel terminal at Hunterston in Ayrshire and by rail from the rest of Scotland.

Scottish Power is currently decommissioning the site. The closure of Longannet Power Station marks the end of coal fired electricity production in Scotland.

Layout

Any coal -fired power station is made up of several components to enable the generation of electricity by burning coal namely: coal handling area, boiler house, turbine hall, switchgear, ash handling, chimney and cooling water circulation system.

Coal handling

Coal handling area was designed to handle upto 24,000 tonnes per day. The coal arrived on site (by ship and train) and was put into one of three hoppers for both road and rail. These are of different sizes. There was an exchange hopper that was built to take the Longannet Mine coal that was transferred into bunkers in the main boiler house by a 1.5km long conveyor. This conveyor carried 3,500 tonnes per hour. In addition, 2,000,000 metric tonnes of coal could be held in reserve in the coal yard (to the west of the power station site). (8) Longannet Power Station could use 4,500,000 metric tonnes (4,400,000 long tons or 5,000,000 short tons) of coal per year. The coal was brought on site, initially from Longannet Colliery, in bottom emptying railway coal wagons which unloaded automatically as they rolled through the site.

Boiler House

The coal was then taken by conveyor from the bunkers and pulverised or ground down into a powder by the vertical pulverising mills (see DP244006). There were 8 pulverisers for each of the four 64m high boilers in the boiler house. Each mill could handle 40 tonnes of coal per hour. The pulverised coal was then air-blown into the furnaces where it burned at very high temperature.

The four, front-wall fired Foster Wheeler Boilers (BOFA) were made up of many metal, water-filled tubes. The combusting coal powder below the boiler tubes send up hot gases which cause the water in the tubes to boil and produce steam. Each boiler had a steam drum into which the pressurized steam was fed. This steam then passed through a bank of steam tubes placed at the top and back of the boiler. The steam is then reheated to 568 degrees centigrade to be passed to the high pressure turbine cylinder. Each boiler could burn 250 tonnes of coal per hour. Each boiler had two forced and two induced draught fans. Gas was also used as a fuel in the boilers. (9)

Turbine Hall

Power at Longannet Power Station is from four 600MW (6,000,000-kilowatt) turbine -generators. Some 1800 tonnes of steam (see DP 243992) an hour per boiler was superheated to 586 degrees centigrade and piped (at at pressure of 168 bars) to the high pressure cylinders of two 300 MW GEC turbo generators (see DP 244007).

The turbine parallel rotors spun at 3000 r.p.m. each turning the electromagnet of a 300,000 -kilowatt electrical generator at the rate of 50 revolutions per minute. The rings of the blades of the rotors were divided between a number of cylinders which were interconnected by steam pipework. The steam expanded throughout the high pressure cylinder on one of the shafts and was then piped back to the boiler. It was then reheated to its original temperature and passed to the first of the two intermediate pressure cylinders both of which were on the other rotor.

From the second intermediate pressure cylinder, the steam flowed to the steam casings two of which were mounted on either shaft. Both the tow intermediate pressure and the four low pressure cylinders were of double flow design, where the steam entered at the centre and travelled to both ends of the casing. To allow for the expansion of the stream through the turbine, larger blades were used towards the low pressure end of the machine: the largest blades (914mm in length) were positioned before the eight exhausts of the low pressure cylinders.

Mounted below each pair of low pressure cylinders was a condenser (operating at high vacuum) which condensed steam into water which was then used as feed water for the boilers via feed heaters. These utilised the steam bled from various points on the turbine to heat it to the correct temperature. (10) The townswater supply was used for steam generation.

The Central Control Room was fitted with supervisory desks and it was from here that 'hot starts' and shut downs were controlled as well as normal everyday operation. When fitted, all of the control panels were had close circuit television for monitoring boiler drum water levels and fully automatic boiler control. The annex to the Control Room was from where communications for the power station were controlled along with the common electrical and mechanical services. There was also a control panel for the 275kV switchgear. (11)

The condensers used seawater from the Firth of Forth to cool the steam (see DP 244009 and DP 244010) with upto 327,000 cubic metres of water required per hour.This cooling water was then returned to the Firth of Forth via a 1.6km long channel which measured 38m in width (top) and 7.3m in depth. (12)

Switchhouse

The outputs of the two generators were combined at a generator transformer where the pressure of the electricity was raised from 17 kilovolts (kV) to 275 kilovolts (kV) before passing to an indoor switchhouse adjacent to the main building. This electricity was then fed into the National Grid via 275kV overhead lines to 275kV transforming and switching stations on the transmission system. (13)

Ash Handling

The generation of electricity from coal generates ash, dust and other emissions. The power station could produce up to 4350 tonnes of ash a day. Most of this was mixed with water and pumped to off-shore disposal lagoons at Valleyfield (some 5km distant) for land reclamation. (14) Electrostatic precipitators (refurbished 1989-1994) were used to capture dust particles (using plates with a static electricity charge) from the flue gases followed by sulphur trioxide equipment in the 1980s. Longannet was also fitted with a BOFA system (in 1994) to reduce nitrous oxide (NOx) emissions by injecting natural gas into the boiler and flue gas desulphurization (FGD) equipment was installed to reduce sulphur dioxide (SO2).

The fuel ash produced by the burning of the coal falls into two categories: pulverised fuel ash (PFA) removed by the electrostatic precipitators and furnace bottom ash (FBA from the boilers and sent to Settlement Ponds) which collected at the bottom of the boiler. Most of this ash was in the form of a fine dust (PFA) from the electrostatic precipitators. The rest of the ash (PFA and FBA) was transported to the storage lagoons at Valleyfield (east of the site). (15) Latterly, a company called ScotAsh (based at Longannet) made construction products from the ash on site. (16) The windshield or chimney is 183m (600 feet) in height and was the tallest concrete structure in Scotland when built. (17)

Cooling Water

When in operation, 636 cubic metres (3217 million litres) of water per hour was drawn through intake headworks 150m offshore in the River Forth. (18) The intake structure was of course screens to filter out matter and to protect the salmon smolt. Finer screening was carried out at the station pump house which was connected to vertical shafts and tunnels 11m below the riverbed.

The pump-bay of the Pump House contained 4 large electrically driven pumps, each with a capacity to pump 80 million litres of condenser cooling water per hour along 4 culverts (3.7m in diameter) to the condensers. (19)

References

(1) SSEB, Longannet Power Station, (c.1974), introduction (unpaginated)

(2) SSEB, Longannet Power Station, (c.1974),, 'cross section of station', (unpaginated)

(3) Gifford, J; McWilliam,C.E. and Walker, D , The Buildings of Scotland, Edinburgh, (London, 1988, 266)

(4) Information from Richard Christie of Scottish Power

(5) Scottish Power Longannet Power Station EMAS Statement (2014 )

(6) SSEB, Longannet Power Station, (March 1971), 10

(7) SSEB, Longannet Power Station, (March 1971), 10

(8) SSEB, Longannet Power Station, (c.1974), 'Coal Delivery System', (unpaginated)

(9) SSEB, Longannet Power Station, (c.1974), 'Boiler Plant', (unpaginated)

(10) SSEB, Longannet Power Station, (c.1974), 'Generating Units', (unpaginated)

(11) SSEB, Longannet Power Station, (c.1974), 'Control Room', (unpaginated)

(12) SSEB, Longannet Power Station, (c.1974), 'Outflow of Cooling Water', (unpaginated)

(13) SSEB, Longannet Power Station, (c.1974), 'Transmission', (unpaginated)

(14) SSEB, Longannet Power Station, (March 1971), 20

(15) SSEB, Longannet Power Station, (c.1974), 'P.F.A. Disposal', (unpaginated); Scottish Power, Longannet Power Station: site information http://www.scottishpower.com/userfiles/file/Longannet-Site-Information-2014.pdf [Retrieved: 21/11/2016]

(16) Information from Richard Christie or Scottish Power

(17) SSEB, Longannet Power Station, (March 1971), 11

(18) SSEB, Longannet Power Station, (March 1971), 18

(19) SSEB, Longannet Power Station, (March 1971), 18

Acknowledgement:

HES wishes to thank Mr Richard Christie of Scottish Power for giving his time and for sharing knowledge about Longannet Power Station during the Survey and Recording Section, Architecture and Industry survey team visit in July 2016.

Visited by Survey and Recording Section: Architecture and Industry, HES (Miriam McDonald), July 2016.

Photographic Survey (8 June 2016 - 9 June 2016)

This thermal (coal) electricity generating station ceased generation on the 24th March 2016. It is now undergoing decommissioning.

A photographic survey was undertaken by the Survey and Recording Section (Architecture and Industry) of Historic Environment Scotland, 8-9 June 2016 to enhance the record in HES site database, Canmore, for this site.

Information from HES (MMD, Survey and Recording Section), 16 June 2016

References

MyCanmore Image Contributions


Contribute an Image