Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Pricing Change

New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered. 

 

Balado Bridge Airfield

Control Tower (20th Century)

Site Name Balado Bridge Airfield

Classification Control Tower (20th Century)

Canmore ID 274678

Site Number NO00SE 26.01

NGR NO 09709 03608

Datum OSGB36 - NGR

Permalink http://canmore.org.uk/site/274678

Ordnance Survey licence number AC0000807262. All rights reserved.
Canmore Disclaimer. © Bluesky International Limited 2024. Public Sector Viewing Terms

Toggle Aerial | View on large map

Digital Images

Collections

Administrative Areas

  • Council Perth And Kinross
  • Parish Kinross
  • Former Region Tayside
  • Former District Perth And Kinross
  • Former County Kinross-shire

Archaeology Notes

NO00SE 26.01 09709 03608

The control tower for Balado Bridge airfield survives at the NE corner of the runways within the eastern perimeter track. The tower is situated on private land.

Known as a fighter satellite station watch office the building is visible on vertical air photographs taken in 1947 (CPE/Scot/UK 290, Pt.III, 5199-5201, flown 2 September 1947).

Information from RCAHMS (DE), September 2005

Activities

Standing Building Recording (14 October 2019)

A programme of Historic Building Recording works was undertaken by AKD Archaeology on 14th October 2019, in advance of the demolition and replacement of the Control Tower building at Balado Airfield (MPK: 7782), Kinross. The works were designed to create a competent record of the historic elements of the Control Tower before loss at an Enhanced Level of recording.

The literature associated with the Control Tower confirms that the

pattern of the structure was updated on three separate occasions;

4520/41, 8142/41, 7332/42 (Control Towers.co.uk 2019). It is not

known the exact changes that these pertain to. Although it can be

suggested that there are seven phases in the structures development,

it is possible to record from the survey four phases in the structural

development of the Control Tower.

Information from: Peter Klemen (AKD Archaeology) 23rd October 2019

OASIS ID: akdarcha1-371184

References

MyCanmore Image Contributions


Contribute an Image

MyCanmore Text Contributions