Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Pricing Change

New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered. 

 

BALADO BRIDGE AIRFIELD

Date 14 October 2019

Event ID 1148051

Category Recording

Type Standing Building Recording

Permalink http://canmore.org.uk/event/1148051

A programme of Historic Building Recording works was undertaken by AKD Archaeology on 14th October 2019, in advance of the demolition and replacement of the Control Tower building at Balado Airfield (MPK: 7782), Kinross. The works were designed to create a competent record of the historic elements of the Control Tower before loss at an Enhanced Level of recording.

The literature associated with the Control Tower confirms that the

pattern of the structure was updated on three separate occasions;

4520/41, 8142/41, 7332/42 (Control Towers.co.uk 2019). It is not

known the exact changes that these pertain to. Although it can be

suggested that there are seven phases in the structures development,

it is possible to record from the survey four phases in the structural

development of the Control Tower.

Information from: Peter Klemen (AKD Archaeology) 23rd October 2019

OASIS ID: akdarcha1-371184

People and Organisations

References