Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Gairlochy, Mucomir Hydro-electric Power Station

Hydroelectric Power Station (Modern)

Site Name Gairlochy, Mucomir Hydro-electric Power Station

Classification Hydroelectric Power Station (Modern)

Alternative Name(s) Mucomir Cut And Bridge; Mucomir Cut; River Lochy; River Spean

Canmore ID 159951

Site Number NN18SE 22

NGR NN 18358 83861

Datum OSGB36 - NGR

Permalink http://canmore.org.uk/site/159951

Ordnance Survey licence number AC0000807262. All rights reserved.
Canmore Disclaimer. © Bluesky International Limited 2025. Public Sector Viewing Terms

Toggle Aerial | View on large map

Digital Images

Administrative Areas

  • Council Highland
  • Parish Kilmonivaig
  • Former Region Highland
  • Former District Lochaber
  • Former County Inverness-shire

Archaeology Notes

NN18SE 22.00 18358 83861

Power Station [NAT]

OS (GIS) AIB, April 2006.

NN18SE 22.01 NN 18330 83859 Bridge (over Mucomir Cut)

NN18SE 22.02 NN 18360 83828 Footbridge (over tail-race)

For associated Mucomir Cut (NN 18395 84479 to NN 18353 83797), see NN18SE 27.00.

Year first commissioned: 1962

Gross head: 23ft [7m]

Installed capacity: 1.95mW

Average annual output: 9 million units

P L Payne 1988.

Mucomir Cut, 1951. Power station installed in a channel between the S end of Loch Lochy and the Spean River. Average annual output 9 million units.

J Miller 2002.

References

MyCanmore Image Contributions


Contribute an Image

MyCanmore Text Contributions