Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Construction

Date 1966 - 31 December 1969

Event ID 576696

Category Building History

Type Construction

Permalink http://canmore.org.uk/event/576696

Two slab blocks built as public housing for Aberdeen Borough Council as part of the redevelopment of Castlehill. The nineteen-storey block contains 108 dwellings. The nine-storey block contains 48 dwellings. Both blocks have balcony acccess. They are linked with walkways at several levels. The contractor for the development was W. J. Anderson Ltd. Construction began in 1966.

Glendinning and Methusius 1994

People and Organisations

References