Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Pricing Change

New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered. 

 

Upcoming Maintenance

Please be advised that this website will undergo scheduled maintenance on the following dates:

Thursday, 9 January: 11:00 AM - 3:00 PM

Thursday, 23 January: 11:00 AM - 3:00 PM

Thursday, 30 January: 11:00 AM - 3:00 PM

During these times, some functionality such as image purchasing may be temporarily unavailable. We apologise for any inconvenience this may cause.

 

Replacement Overhead Line (YX route), Ben Cruachan Hydro Power Station to Dalmally Substation

Event ID 1093514

Category Recording

Type Field Walking

Permalink http://canmore.org.uk/event/1093514

NN 0800 2773 - NN 1422 2939: A targeted walkover survey was carried out by CFA Archaeology Ltd along the route of an overhead power line from Ben Cruachan Hydro Power Station to Dalmally substation in advance of line replacement works.

Walkover survey around proposed Equipotential Zones and ATV access routes found an extensive area of rig-and-furrow, as well as a large drystone enclosure. Survey also visited two previously known sites in the vicinity of proposed Balfour Beatty operations on site. Site 3, an area of rig-and-furrow near Tower YX10, and site 5 near Tower YX12 consisting of a field bank, rig-and-furrow and a possibly related tumbled rectangular stone-wall structure. Sites in close proximity to the works were demarcated. No further mitigation was required.

Funder: Balfour Beatty Utility Solutions Ltd

CFA Archaeology Ltd - Ewan MacNeilage