Reports from a cultural heritage assessment, field survey and excavation for replacement overhead line (YX route) Ben Cruachan Hydro Power Station to Dalmally Substation, Argyll and Bute

551 30/4/81/1

Description Reports from a cultural heritage assessment, field survey and excavation for replacement overhead line (YX route) Ben Cruachan Hydro Power Station to Dalmally Substation, Argyll and Bute

Date 27/3/2014 to 7/2015

Collection Records of CFA Archaeology Ltd, archaeologists, Musselburgh, East Lothian, Scotland

Catalogue Number 551 30/4/81/1

Category All Other

Accession Number 2016/60

External Reference YXDB

Permalink http://canmore.org.uk/collection/1966029

Collection Hierarchy - Sub-Group Level

Preview Category Catalogue Number Title Date Level
Digital Files (Non-image) WP 006728 Mitigation for site 12, Replacement Overhead Line (YX route) Ben Cruachan Hydro Power Station to Dalmally Substation c. 4/2015 Item Level
Digital Files (Non-image) Digital Files (Non-image) WP 006729 Report: 'YX Overhead Line - Ben Cruachan Hydro to Dalmally Substation: ATV Access Routes and EPZ, Archaeological Mitigation Works, Written Scheme of Investigation', May 2015 5/5/2015 Item Level
Digital Files (Non-image) Digital Files (Non-image) WP 006730 Report: 'YX Overhead Line - Ben Cruachan Hydro to Dalmally Substation: Access Roads, Archaeological Mitigation Works, Written Scheme of Investigation', May 2015 5/5/2015 Item Level
Digital Files (Non-image) Digital Files (Non-image) WP 006731 Report: 'Replacement Overhead Line (YX route), Ben Cruachan Hydro Power Station to Dalmally Substation, Cultural Heritage Assessment', March 2014 27/3/2014 Item Level
Digital Files (Non-image) Digital Files (Non-image) WP 006732 Report: 'Replacement Overhead Line (YX route), Ben Cruachan Hydro Power Station to Dalmally Substation, Walkover Survey and Archaeological Excavation', July 2015 7/2015 Item Level
Digital Files (Non-image) Digital Files (Non-image) WP 006733 Report: 'Replacement Overhead Line (YX route), Ben Cruachan Hydro Power Station to Dalmally Substation, Walkover Survey', July 2015 7/2015 Item Level