Standing Building Recording

Date 1 November 2017 - 3 November 2017

Event ID 1039752

Category Recording

Type Standing Building Recording

Permalink http://canmore.org.uk/event/1039752

NS 564 666 As part of a wider redevelopment scheme at the former Western Infirmary a detailed measured survey was made, 1–3 November 2017, of a linking corridor between the Elder Memorial Chapel and the former Western Infirmary, which is scheduled for demolition. The work aimed to provide survey drawings which would facilitate the rebuilding of

the corridor at a later date. The survey produced a series of internal and external elevation drawings to which numbers were added identifying each element of the structure.

Archive: NRHE (intended)

Funder: Graham Construction

Jenni Morrison – Addyman Archaeology

(Source: DES, Volume 18)