Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Signetics Corporation Factory, Linlithgow

551 654/3

Description Signetics Corporation Factory, Linlithgow

Collection Donaldson's Hospital

Catalogue Number 551 654/3

Category All Other

Permalink http://canmore.org.uk/collection/1587079

Collection Hierarchy - Group Level

Collection Level (551 654) Donaldson's Hospital

> Group Level (551 654/3) Signetics Corporation Factory, Linlithgow

Preview Category Catalogue Number Title Date Level
Print Room DC 47640 Detailed internal arrangement of a 4'-6'' dia. vertical pressure fliter. 12/8/1967 Item Level
Print Room DC 47641 Foundation detail for MB unit. 28/6/1967 Item Level
Print Room DC 47861 Layout of MV and LV overhead busbar trunking systems. 8/1969 Item Level
Print Room DC 47901 Bulk Gas storage. 27/11/1970 Item Level
Print Room DC 47902 Basement. Layout of ventillation, heating, chilled waterand condenser water installations. 26/10/1970 Item Level
Print Room DC 47903 Ground floor. Layout of LPHW installation. 28/10/1970 Item Level
Print Room DC 47904 Ground floor. Layout of the ventialtion installation. 28/10/1970 Item Level
Print Room DC 47642 Arrangement of Permutit 1'-6'' cation unit. 28/2/1969 Item Level
Print Room DC 47643 External cabling diagram. 3/10/1969 Item Level
Print Room DC 47644 Water treatment plant - flow diagram. 10/10/1969 Item Level
Print Room DC 47645 General arrangement of Permutit water treatment plant and foundation details. 2/12/1969 Item Level
Print Room DC 47862 Survey drawing and borehole record. 3/1969 Item Level
Print Room DC 47863 Manhole details. 5/1969 Item Level
Print Room DC 47909 Valve chart and plant diagrammatic. 16/11/1970 Item Level
Print Room DC 47910 1500 gallon oil storage tank. 5/3/1970 Item Level
Print Room DC 47911 Mild steel chimney and flue pipe details 11/2/1970 Item Level
Print Room DC 47915 Basement floor plan. 30/1/1984 Item Level
Print Room DC 47916 Ground floor plan. Item Level
Print Room DC 47649 Arrangemnet of roof girders. 7/1969 Item Level
Print Room DC 47801 Plan at roof level. 7/1969 Item Level
Print Room DC 47864 Basement drainage and DI neut. plant. 10/1969 Item Level
Print Room DC 47865 Plumbing/ drainage/ details. 10/1969 Item Level
Print Room DC 47866 Ground floor drainage. 5/1969 Item Level
Print Room DC 47867 Basement drainage plan. 8/1969 Item Level

People and Organisations

Events