|
Digital Files (Non-image) |
WP 008078 |
Technical Assessment of the Operation of Coal and Gas Powered Electricity Generating Stations |
2014 |
Item Level |
|
Digital Files (Non-image) |
WP 008038 |
Leaflet on Longannet |
2014 |
Item Level |
|
On-line Digital Images |
DP 237525 |
General view. Access from 148 feet level. Raking view of south elevation from roof of coal conveyor house. |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237587 |
General view of Absorber pipework from north. Three Flue Gas Desilpherization (FGD) pipes are on the left. On the right, seawater (coolant) main water pipecarying water towards seal pits and cooling water channel (north east part of site) |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237592 |
General view of power station taken from the east. Windshield ('chimney') on left. ScotAsh plant (foreground) |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237600 |
General view of power station from east. This area is man made from boiler ash. |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237539 |
Interior general view from west. Turbine Hall East Crane by Arrol of Glasgow bearing plate which says:
"Job 7049 1966 Safe Working Loads 100 Tons main hoist slow/ 50 Tons main hoist fast/10 Tons Auxilliary, main auxilliary hoist" |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237541 |
Interior general view. Turbine Hall, 44 feet level, turbine staters, spares in workshop area |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237543 |
Interior general view. Turbine Hall, Turbine Units 3 and 4 |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237545 |
Interior general view. Turbine Hall looking east towards crane and Turbine No.4 |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237547 |
Interior general view. Turbine Hall. Control Room supply distribution board |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237549 |
Interior general view. Central control room. Circular space with clerestorey lights, 1968/9. Upgraded 1980s. Console desks installed c.1995. |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237550 |
Interior general view. Central control room. Circular space with clerestorey lights, late 1960s. Upgraded 1980s. Console desks installed c.1995. |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237552 |
Interior general view of Control Room. 275kV Control Panels date from 1967/8. |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237554 |
Interior detail of panel. Central Control Room. Original Unit 4 turbine controls not updated as Flue Gas Desulphurization (FGD) equipment not fitted. |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237576 |
Interior general detail. Boiler House. Basement area. Vertical spindle mill no. 3A. This mill or pulveriser takes coal from the coal bunker above and pulverises it with angled rollers which can just be glimpsed through the open door at gantry level. The pulverised coal is then blown up pipes to the distributers which in turn feed the pulverised coal into the boiler plant. Any rejects/foreuiign bodies are ejected into pits |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237578 |
Interior general view. Diesel generator room. Generators for running fire hydrant system on site |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237584 |
General view taken from the north. Bulk hydrogen store (left) and main office block (right). Inclined coal conveyor feeding coal bunker visible |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237586 |
General view taken from the north east. Condensate Polishing Plant (left) adjacent to Turbine House (lower part of building) with Boiler House (centre) |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237589 |
General view taken from the north west. From left to right, Electrostatic precipitators, coal handling, Boiler House and Turbine House. |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237594 |
General view of water channel from east. This channel cools the process water prior to its entering into the River Forth (behind the camera). Power station visible in background |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237595 |
General view of water channel from east. This channel cools the process water prior to its entering into the River Forth (behind the camera). Power station visible in background |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237618 |
General view of Coal Control Tower from south. |
8/7/2016 |
Item Level |
|
On-line Digital Images |
DP 237619 |
General view of Coal Control Tower from south west. |
8/7/2016 |
Item Level |