On-line Digital Images |
DP 150228 |
Interior. Boiler house, lower level, ash handling area. View of chute (opening below conveyor) taking cooled ash blown from boiler. This material was manually handled into the chute by wheelbarrow. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150229 |
Interior. Boiler house, ash handling area, quenching system for heavy ash. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150230 |
Interior. Boiler house, lower floor, ash handling area. Hopper from boiler above. Hot ash drops into hopper and then fed onto reddler and trough quenching system. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150231 |
Boiler house, top of conveyor carrying cooled ash to further conveyor and onto lorry for removal from site. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150233 |
Coal store (NO28163 01813) and conveyor (NO28110 01824)carrying coal to boiler house on east side of Power House. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150235 |
Interior. Boiler house. Top floor. Area where coal conveyor enters building. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150236 |
Interior. Boiler house. Top of boiler. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150237 |
Interior. Boiler house. Top of boiler. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150238 |
Interior. Boiler house. Top of boilers. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150240 |
Interior. Boiler house, coal handling system, 'iron horse' at top of conveyor. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150242 |
Interior. Boiler house, conveyor supplying coal to boilers. Topside of boilers can be seen on right. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150243 |
Interior. Boiler house, topside of boilers. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150199 |
Interior. Boiler house. View of coal bunker fed from coal conveyor (not seen). The travelling coal hopper fed the coal into the Stirling Boiler. This boiler house was rebuilt in 1950. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150202 |
Interior. Boiler house. Control Panel for coal handling and boiler. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150204 |
Interior. Boiler house, detail of fireboxes |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150214 |
Fire engine with fire station behind. Tullis Russell had its own site fire brigade. The company no longer maintain a fire engine on site. This Tulis Russell 1960s Bedford fire engine is now maintained by enthusiasts on site. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150219 |
Interior. Boiler house. Ash handling area, quench system, conveyor belt. The boiler ash drops through the grates into hoppers and into the water cooling or quench system. The ash is then removed manually from the wet to dry conveyors and out of the building. The effluent water is processed on site. This came into operation in 1953. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150224 |
Interior. Boiler house. Lower level. Set of louvres. These cast iron plates were set on a belt which moved at 8.5-10 inches per minute to ensure equal combustion within the boilers. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150226 |
Interior. Boiler house. Lower level. Set of louvres. These cast iron plates were set on a belt which moved at 8.5-10 inches per minute to ensure equal combustion within the boilers. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150227 |
Interior. Boiler house, lower level, ash handling area. View of chute taking cooled fly ash blown from boiler and onto conveyor and then removed from site by lorry. This ash dust used in breeze block making. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150179 |
Interior. Turbine hall, later control room |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150180 |
Interior. Turbine hall, general view of south end of original turbine hall of power station completed 1913 |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150181 |
Interior. Turbine hall, South end of turbine hall, dating from 1913. View of turbine. |
23/11/2012 |
Item Level |
 |
On-line Digital Images |
DP 150182 |
Interior. Turbine hall, no. 4 / D turbine switchboard |
23/11/2012 |
Item Level |