Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Pricing Change

New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered. 

 

Achanalt Power Station And Barrage

Barrage (20th Century), Hydroelectric Power Station (20th Century)

Site Name Achanalt Power Station And Barrage

Classification Barrage (20th Century), Hydroelectric Power Station (20th Century)

Alternative Name(s) Conon Valley Hydroelectric Power Scheme; Loch A' Chuilinn

Canmore ID 173051

Site Number NH36SW 18

NGR NH 30896 61972

NGR Description centred NH c. 308 618

Datum OSGB36 - NGR

Permalink http://canmore.org.uk/site/173051

Ordnance Survey licence number AC0000807262. All rights reserved.
Canmore Disclaimer. © Bluesky International Limited 2024. Public Sector Viewing Terms

Toggle Aerial | View on large map

Digital Images

Administrative Areas

  • Council Highland
  • Parish Contin
  • Former Region Highland
  • Former District Ross And Cromarty
  • Former County Ross And Cromarty

Activities

Field Visit (2010)

Achanalt power station is a small station which utilises water diverted by the Bran barrage which lies immediately upstream (see separate item). The station contains a single turbine. The station also includes an unusual fish pass which combines both artificial and man made chambers in a cascade of interlinked pools. This is a good example of a small station, effectively utilising run-of-the river type technology in conjunction with a small amount of flow regulation as a consequence of the barrage. The station has additional interest from the unusual fish pass and the setting within a steep rocky gorge. National Archives of Scotland (NAS), Ref: NSE North of Scotland Hydro Electric Board Collection (1943 -1990); NAS, Ref: NSE1 North of Scotland Hydro Electric Board Minutes (1943-1990); NAS, Ref NSE2 North of Scotland Hydro Electric Board Annual Reports (1943-1990); PL Payne, 1988; E Wood, 2002, 30; J Miller, 2002, 92:88918; Scottish Hydro Electric, 2000, 10.

Note (25 October 2023)

The Conon scheme

This project involves three separate stages: the Fannich scheme, the Glascarnoch-Luichart-Torr Achilty scheme and the Orrin scheme. The first of these involved tunnels and aqueducts to increase the flow into Loch Fannich, and a tunnel from the bed of Loch Fannich to the Grudie Bridge power station at the west end of Loch Luichart. This involved a severe problem at the Loch Fannich end. Work began in 1946 and a dam was built later, completing the section in 1951.

Work began on the second stage in 1951., producing two artificial lochs Vaich and Glascarnoch by damming the respective rivers, using the earth and rockfill method. Tunnels were excavated between these lochs and from Loch Glascarnoch to Mossford power station on Loch Luichart. A dam at the east end of Loch Achanalt allows loch to supply the Achsanalt power station near Grudie Bridge. Two artificial lochs Meig and Achonachie were produced by dams on the rivers Meig and Conon to supply power stations at Luichart and Torr Achilty respectively. Work on this section was completed in 1957.

The Orrin scheme was started in 1955 and involved the building of a mass gravity dam 1000 feet long and an earth embankment also 1000 feet in length to seal off a branch valley, thus forming the Orrin Reservoir. The outflow is through a concrete -lined tunnel to a steel pipeline supplying the Orrin power station at Loch Achonachie. Four Borland fish lifts had been installed at Luichart, Meig, Achanalt and Torr Achilty. The scheme was completed in 1961, the six power stations producing an output well over 100,000 kW.

Information from NRHE catalogue record WP007424, compiled by George Walker, 2005.

References

MyCanmore Image Contributions


Contribute an Image

MyCanmore Text Contributions