Pricing Change
New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered.
Upcoming Maintenance
Please be advised that this website will undergo scheduled maintenance on the following dates:
Thursday, 30 January: 11:00 AM - 3:00 PM
During these times, some functionality such as image purchasing may be temporarily unavailable. We apologise for any inconvenience this may cause.
Field Visit
Date 2010
Event ID 882038
Category Recording
Type Field Visit
Permalink http://canmore.org.uk/event/882038
Lussa dam provides storage and flow regulation for Lussa Power Station (see separate item). The dam raised the level of two pre-existing lochs to create a single large storage loch. The dam also includes a tunnel intake gatehouse which is located immediately adjacent to the upstream side of the dam and accessed by a concrete walkway. This houses the control gates which allow the isolation and regulation of water flow into the tunnel through to Lussa Power Station. This dam is of relatively standard type, with a curved central buttressed section incorporating a fixed spillway. The dam is of relatively small scale and does not make a significant landscape contribution. PL Payne, 1988, 5; E Wood, 2002, 38; J Miller, 2002.