Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Pricing Change

New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered. 

 

Upcoming Maintenance

Please be advised that this website will undergo scheduled maintenance on the following dates:

Thursday, 9 January: 11:00 AM - 3:00 PM

Thursday, 23 January: 11:00 AM - 3:00 PM

Thursday, 30 January: 11:00 AM - 3:00 PM

During these times, some functionality such as image purchasing may be temporarily unavailable. We apologise for any inconvenience this may cause.

 

Field Visit

Date 2010

Event ID 882017

Category Recording

Type Field Visit

Permalink http://canmore.org.uk/event/882017

Breaclaich dam is designed to prevent Loch Breachlaich and a number of other intakes from discharging into the Loch Tay catchment. A tunnel intake gatehouse is upstream of the dam and takes water via tunnel and pipeway through to Lednock power station (see separate item). Breaclaich Dam is a relatively standard design of gravity dam with a coursed rubble downstream face and concrete panel upstream face. The tunnel intake gatehouse is also of predominantly standard functional design. PL Payne, 1988, 24; E Wood, 2002, 50.