Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Field Visit

Date 2010

Event ID 881934

Category Recording

Type Field Visit

Permalink http://canmore.org.uk/event/881934

This dam controls the flow of water for Earlstoun Powerhouse as well as providing a degree of daily storage. The dam is a combination of concrete gravity and mass concrete and has an integrated spillway. this dam combines gravity and mass concrete sections with a large fixed spillway and is designed on a relatively steep curve to accommodate the shape of the valley. The functionalist classical design which characterises the Galloway scheme is applied to the control tow and the battered downstream face. The landscape presence of the dam is increased by the large gantry to support the paired roller gates to the centre. P L Payne, 1988, 24; E Wood, 2002, 50; G Hill, 1984.

People and Organisations

References