Publication Account
Date 1938
Event ID 632471
Category Descriptive Accounts
Type Publication Account
Permalink http://canmore.org.uk/event/632471
Kendoon Power Station: 2nd stage of project
Average net head: 150ft (45.7m)
Catchment area: 152 sq miles (394 sq km)
Max. load: 21,000 kW [47% of 2nd stage total: 37% of grand total]
Units per annum: 36 million [48% of 2nd stage total: 35% of grand total]
No. of main turbines: 2
Anon. 1934 ['Galloway Water Power Scheme'].
(Detailed description of power generation equipment and switchgear).
English Electric Company Limited [post-1936].
Kendoon Power Station
Catchment area: 152 sq mi (394 sq km)
Average net head: 150 ft (45.7m)
Water consumption on full load at average head: 1900 cusec
Number and size of units: 2x10500kW
Gross volume of turbine room (incl. loading bay), above main floor level = total: 223,000 cu ft (6314.8 cu m)
Gross volume of turbine room (incl. loading bay), above main floor level = per kW: 10.6 cu ft (0.3 cu m)
Range of net heads: 147-156ft (482.1-47.6m)
No. of rating of generator sets installed: 2x10,500 kW
Turbine output: 14,800 hp
Specific speed: 57 rpm
Normal speed: 250 rpm
Runaway speed: 463 rpm
Water consumption per turbine on full load at average head: 9540 cusecs
Diameter of runner: 7ft 7ins (2.3m)
This power station is intended for manned operation.
Anon. 1938 ['Galloway Hydro-Electric Development'].