Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Civil Engineering heritage: Scotland - Lowlands and Borders

Date 2007

Event ID 610050

Category Descriptive Accounts

Type Publication Account

Permalink http://canmore.org.uk/event/610050

This elegant reinforced-concrete bridge, erected in 1931–32 carrying Bridge Street 80 ft above the Tower Burn, is 536 ft long and 40 ft wide. It has a main arch span of 185 ft with a rise of 3312 ft and is one of the largest bridges of its type in Scotland containing about 6750 tons of concrete and about 100 miles of steel reinforcement weighing 320 tons. Designer, F. A. Macdonald & Partners, Glasgow; D. H. Shaw, Burgh Engineer; Contractor, Street & Co., Dunfermline.

R Paxton and J Shipway 2007

Reproduced from 'Civil Engineering heritage: Scotland - Lowlands and Borders' with kind permission from Thomas Telford Publishers.

People and Organisations

References