Pricing Change
New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered.
Upcoming Maintenance
Please be advised that this website will undergo scheduled maintenance on the following dates:
Thursday, 9 January: 11:00 AM - 3:00 PM
Thursday, 23 January: 11:00 AM - 3:00 PM
Thursday, 30 January: 11:00 AM - 3:00 PM
During these times, some functionality such as image purchasing may be temporarily unavailable. We apologise for any inconvenience this may cause.
Civil Engineering heritage: Scotland - Lowlands and Borders
Date 2007
Event ID 590004
Category Descriptive Accounts
Type Publication Account
Permalink http://canmore.org.uk/event/590004
This bridge, recently removed, was half a mile downstream from NT36SW and was of trussed girder construction spanning 54 ft between sandstone masonry abutments. Its width was 6 ft with a timber deck carried on three slightly arched T-section ribs carrying a timber deck. The rib ends were connected by iron tie-rods 112 in. in diameter with three small strut spacers supporting the T-sections. A curious feature was the sockets for the handrailing cast integral with the T-section beams top flange. This bridge probably resulted from John Neil’s estimate to ‘furnish and fit up’ for £128 including scaffolding. Wm. Paterson offered to do the abutment mason work for £42 6s 612d. This design, presumably by Robert Stevenson, was a small scale development of his underspanned tension rod suspension bridge proposed for Cramond in 1820.
R Paxton and J Shipway 2007
Reproduced from 'Civil Engineering heritage: Scotland - Lowlands and Borders' with kind permission of Thomas Telford Publishers.