Pricing Change
New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered.
Watching Brief
Date 1985
Event ID 571902
Category Recording
Type Watching Brief
Permalink http://canmore.org.uk/event/571902
NS87NW RRX 505 805 789.
An average of 30cm of topsoil was removed from the area between the S lock wall and the B816 (Seabegs Road) as preparation for the construction of a car park. To the W and E the line of the Wall Ditch is clearly visible as a pronounced hollow, but no sign of it appeared in the redevelopment area due to earlier disturbance associated with the construction of the lock. Watching brief.
G B Bailey 1985.