Watching Brief

Date 4 July 2006 - 11 July 2006

Event ID 551494

Category Recording

Type Watching Brief

Permalink http://canmore.org.uk/event/551494

NS 8880 4145 to NS 8852 4144 Archaeological monitoring was carried out from 4 to 11 July 2006 in advance of the forthcoming refurbishment of Bonnington Penstock Power Station. During the monitoring of a temporary access road no features of archaeological significance were observed. All that was present on site was a disused lead water pipe believed to have supplied water to the Corra Linn Pavilion constructed in 1708.

Report to WoSAS and archive to NMRS.

Sponsor: Halcrow Group Ltd.

C Shaw 2006