Field Visit
Date 2015
Event ID 1008637
Category Recording
Type Field Visit
Permalink http://canmore.org.uk/event/1008637
This pier was built to allow movement of raw materials and finished product to and from the now demolished Invergordon Aluminium Smelter which closed in 1981. A conveyor that was connected to the pier from the smelter survived until c.1986. The pier is some 1.0km in length, exploiting the deep water in the Cromarty Firth. At its loading end it has a travelling hopper and crane and two fixed green light beacons.
Visited by HES (MMD), 12 Octpber 2015