Scottish and Southern Electricity Plc commissioned SUAT Ltd to undertake an archaeological walkover survey on the route of overhead power cables running from Drimore to North Glendale on the island of South Uist, Western Isles. The survey was to be conducted in advance of refurbishment of the poles supporting the power cables, commencing at NGR NF 7690 4035 and proceeding southwards over a distance of approximately 25km. The work (SUAT site code SU01) was undertaken during the period 6th-8th September 2005 in varying weather conditions including both bright sunshine and rain squalls.

The requirement was to evaluate those sections of the line where groundworks or vehicle access would be necessary, assessing the possible impact of the work on known or previously unrecorded archaeological sites, as well as locating and describing the latter. Four previously unrecorded sets of features were noted on known sites, while a mitigation strategy agreed with SSE ensured that the refurbishment work was able to proceed without disturbance or damage to the archaeology of South Uist.

SUAT Ltd. 2005

People and Organisations

References