Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Scheduled Maintenance


Please be advised that this website will undergo scheduled maintenance on the following dates: •

Tuesday 3rd December 11:00-15:00

During these times, some services may be temporarily unavailable. We apologise for any inconvenience this may cause.

 

South approach viaduct - detail of the change from conventional rails (top) to the special Forth Bridge rails (fixed directly by coach screws onto wooden pads on the deck). Digital image of B 3151.

SC 728334

Description South approach viaduct - detail of the change from conventional rails (top) to the special Forth Bridge rails (fixed directly by coach screws onto wooden pads on the deck). Digital image of B 3151.

Date 29/8/1988

Collection Records of the Royal Commission on the Ancient and Historical Monuments of Scotland (RCAHMS), Edinbu

Catalogue Number SC 728334

Category On-line Digital Images

Copy of B 3151

Scope and Content Joint between conventional rails and 'Forth Bridge Rails' on south approach viaduct, Forth Bridge, Edinburgh and Fife The Forth Bridge was built between 1883 and 1890 to designs by engineers Sir John Fowler (1817-98) and Sir Benjamin Baker (1840-1907) with Sir William Arrol (1839-1913) and Joseph Phillips as contractors. This massive steel railway viaduct features three double cantilevers connected by girders with a total span of 2.5 km. This shows the point in the railway track where the rails change from standard rails (top) to special 'Forth Bridge Rails' on the approach viaduct. Forth Bridge rails are bolted directly onto timber logs within a trough, whereas standard rails are secured with metal clips to sleepers set in ballast (gravel). The Forth Bridge expands and contracts due to climate changes, sometimes varying up to 0.6m in length between summer and winter. To cope with these variations expansion joints (rails cut at an angle so they can slide backwards and forwards) in the rails move with the bridge to ensure the safety of trains. Source: RCAHMS contribution to SCRAN.

Permalink http://canmore.org.uk/collection/728334

File Format (TIF) Tagged Image File Format bitmap

Collection Hierarchy - Item Level

Collection Level (551 1) Records of the Royal Commission on the Ancient and Historical Monuments of Scotland (RCAHMS), Edinburgh, Scotland

Group Level (551 1/4) National Survey Programmes

>> Sub-Group Level (551 1/4/7) Threatened Buildings Survey Programme

>>> Sub-Group Level (551 1/4/7/44) Threatened Buildings Survey 1988

>>>> Sub-Group Level (551 1/4/7/44/1) Forth Rail Bridge

>>>>> Item Level (SC 728334) South approach viaduct - detail of the change from conventional rails (top) to the special Forth Bridge rails (fixed directly by coach screws onto wooden pads on the deck). Digital image of B 3151.

People and Organisations

Events

Attribution & Licence Summary

Attribution: © Crown Copyright: HES

Licence Type: Full

You may: copy, display, store and make derivative works [eg documents] solely for licensed personal use at home or solely for licensed educational institution use by staff and students on a secure intranet.

Under these conditions: Display Attribution, No Commercial Use or Sale, No Public Distribution [eg by hand, email, web]

Full Terms & Conditions and Licence details

MyCanmore Text Contributions