|
On-line Digital Images |
SC 2161210 |
Image from untitled photo album, Turbine Pit Condensate extraction plant and gland heater in position |
6/1/1950 |
Item Level |
|
On-line Digital Images |
SC 2161211 |
Image from untitled photo album, General view of Station from West |
29/9/1949 |
Item Level |
|
On-line Digital Images |
SC 2161212 |
Image from untitled photo album, Excavation for 74" C.W. pipes. South pipe extended level with existing North pipe. |
30/12/1949 |
Item Level |
|
On-line Digital Images |
SC 2161213 |
Image from untitled photo album, 3A and 3B Bunker Conveyors viewed from temporary tower at East end of Bailey Bridge |
31/10/1949 |
Item Level |
|
On-line Digital Images |
SC 2161214 |
Image from untitled photo album, General View of Station from South Side. Brickwork complete. |
6/1/1950 |
Item Level |
|
On-line Digital Images |
SC 2161215 |
Image from untitled photo album, 1B Tunnel Conveyor complete. 1A under construction. |
31/10/1949 |
Item Level |
|
On-line Digital Images |
SC 2161216 |
Image from untitled photo album, Annexe 30.0' level taken from G.B. Tower. No. 1 H.P. Heater in position. No. 2 being lifted. |
2/2/1950 |
Item Level |
|
On-line Digital Images |
SC 2161217 |
Image from untitled photo album, General View of 2A and 2B Gravity Bucket Elevators at 149'6" O.D. level |
31/10/1949 |
Item Level |
|
On-line Digital Images |
SC 2161218 |
Image from untitled photo album, Ash Bunker Hopper complete. Side Walls under construction. |
19/8/1949 |
Item Level |
|
On-line Digital Images |
SC 2161219 |
Image from untitled photo album, Economiser Being Erected |
2/2/1950 |
Item Level |
|
On-line Digital Images |
SC 2161220 |
Image from untitled photo album, Upper Furnace Wall Riser Tubes. Side and Rear Walls Complete, Front Wall being erect |
31/10/1949 |
Item Level |
|
On-line Digital Images |
SC 2161221 |
Image from untitled photo album, Plant Supporting Steelwork in S. Pits |
2/2/1950 |
Item Level |
|
On-line Digital Images |
SC 2161222 |
Image from untitled photo album, Erection of Superheater by-pass and Economiser Front Wall casing |
31/10/1949 |
Item Level |
|
On-line Digital Images |
SC 2161223 |
Image from untitled photo album, General View of Ash House showing Pump Plinths and Reservoir and Sump |
2/2/1950 |
Item Level |
|
On-line Digital Images |
SC 2161224 |
Image from untitled photo album, General View of Station from South Brickwork 149'6" OD level |
31/10/1949 |
Item Level |
|
On-line Digital Images |
SC 2161225 |
Image from untitled photo album, No. 1 Generator Transformer Arriving on Site |
2/2/1950 |
Item Level |
|
On-line Digital Images |
SC 2161226 |
Image from untitled photo album, Construction of Rail access bridge to Turbine Room |
31/10/1949 |
Item Level |
|
On-line Digital Images |
SC 2161227 |
Image from untitled photo album, No. 1 Generator Transformer Mounted on Rails in Moat |
7/2/1950 |
Item Level |
|
On-line Digital Images |
SC 2161228 |
Image from untitled photo album, Roof of Dust Bunker under Construction. Ash Hopper Complete. |
29/11/1949 |
Item Level |
|
On-line Digital Images |
SC 2161230 |
Image from untitled photo album, No. 1 Transformer being skidded into Transformer House |
28/2/1950 |
Item Level |
|
On-line Digital Images |
SC 2161231 |
Image from untitled photo album, General View from Annexe Roof |
19/8/1949 |
Item Level |
|
On-line Digital Images |
SC 2161232 |
Image from untitled photo album, Air Heaters viewed from North-East corner. Air and Gas ducting being erected. |
29/11/1949 |
Item Level |
|
On-line Digital Images |
SC 2161234 |
Image from untitled photo album, General View of Station from West. Ash House steelwork. |
29/11/1949 |
Item Level |
|
On-line Digital Images |
SC 2161235 |
Image from untitled photo album, Ash Bunker Complete. Hopper side walls of Dust Bunker under coast. |
29/9/1949 |
Item Level |