Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Pricing Change

New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered. 

 

Upcoming Maintenance

Please be advised that this website will undergo scheduled maintenance on the following dates:

Thursday, 9 January: 11:00 AM - 3:00 PM

Thursday, 23 January: 11:00 AM - 3:00 PM

Thursday, 30 January: 11:00 AM - 3:00 PM

During these times, some functionality such as image purchasing may be temporarily unavailable. We apologise for any inconvenience this may cause.

 

Photo album, untitled, Volume 157

PA 123/157

Description Photo album, untitled, Volume 157

Date 19/8/1949 to 8/2/1950

Collection Scottish Power

Catalogue Number PA 123/157

Category Print Room

Scope and Content Images showing construction of the site, including: main building; boiler, furnace and wall risers; turbine hall foundations and turbo-alternator steel work; air heaters; no.1 high pressure heater; condenser installation; condenser extractor pump; fan chamber; precipitators; aux. circulating water strainers and culvert; no.3A and 3B bunker conveyors; no.1B tunnel conveyor; no.2A an d2B gravity bucket elevators; ash hoppers; ash house interior; no.1 and 2 generator transformer houses; control room interior; rail access bridge.

Accession Number 1992/43

External Reference Portobello Vol 155

Permalink http://canmore.org.uk/collection/432830

Collection Hierarchy - Batch Level

Preview Category Catalogue Number Title Date Level
On-line Digital Images On-line Digital Images SC 2161210 Image from untitled photo album, Turbine Pit Condensate extraction plant and gland heater in position 6/1/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161211 Image from untitled photo album, General view of Station from West 29/9/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161212 Image from untitled photo album, Excavation for 74" C.W. pipes. South pipe extended level with existing North pipe. 30/12/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161213 Image from untitled photo album, 3A and 3B Bunker Conveyors viewed from temporary tower at East end of Bailey Bridge 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161214 Image from untitled photo album, General View of Station from South Side. Brickwork complete. 6/1/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161215 Image from untitled photo album, 1B Tunnel Conveyor complete. 1A under construction. 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161216 Image from untitled photo album, Annexe 30.0' level taken from G.B. Tower. No. 1 H.P. Heater in position. No. 2 being lifted. 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161217 Image from untitled photo album, General View of 2A and 2B Gravity Bucket Elevators at 149'6" O.D. level 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161218 Image from untitled photo album, Ash Bunker Hopper complete. Side Walls under construction. 19/8/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161219 Image from untitled photo album, Economiser Being Erected 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161220 Image from untitled photo album, Upper Furnace Wall Riser Tubes. Side and Rear Walls Complete, Front Wall being erect 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161221 Image from untitled photo album, Plant Supporting Steelwork in S. Pits 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161222 Image from untitled photo album, Erection of Superheater by-pass and Economiser Front Wall casing 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161223 Image from untitled photo album, General View of Ash House showing Pump Plinths and Reservoir and Sump 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161224 Image from untitled photo album, General View of Station from South Brickwork 149'6" OD level 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161225 Image from untitled photo album, No. 1 Generator Transformer Arriving on Site 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161226 Image from untitled photo album, Construction of Rail access bridge to Turbine Room 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161227 Image from untitled photo album, No. 1 Generator Transformer Mounted on Rails in Moat 7/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161228 Image from untitled photo album, Roof of Dust Bunker under Construction. Ash Hopper Complete. 29/11/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161230 Image from untitled photo album, No. 1 Transformer being skidded into Transformer House 28/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161231 Image from untitled photo album, General View from Annexe Roof 19/8/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161232 Image from untitled photo album, Air Heaters viewed from North-East corner. Air and Gas ducting being erected. 29/11/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161234 Image from untitled photo album, General View of Station from West. Ash House steelwork. 29/11/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161235 Image from untitled photo album, Ash Bunker Complete. Hopper side walls of Dust Bunker under coast. 29/9/1949 Item Level

People and Organisations

Events