Photo album, untitled, Volume 157

PA 123/157

Description Photo album, untitled, Volume 157

Date 19/8/1949 to 8/2/1950

Collection Scottish Power

Catalogue Number PA 123/157

Category Print Room

Scope and Content Images showing construction of the site, including: main building; boiler, furnace and wall risers; turbine hall foundations and turbo-alternator steel work; air heaters; no.1 high pressure heater; condenser installation; condenser extractor pump; fan chamber; precipitators; aux. circulating water strainers and culvert; no.3A and 3B bunker conveyors; no.1B tunnel conveyor; no.2A an d2B gravity bucket elevators; ash hoppers; ash house interior; no.1 and 2 generator transformer houses; control room interior; rail access bridge.

Accession Number 1992/43

External Reference Portobello Vol 155

Permalink http://canmore.org.uk/collection/432830

Collection Hierarchy - Batch Level

Preview Category Catalogue Number Title Date Level
On-line Digital Images On-line Digital Images SC 2161210 Image from untitled photo album, Turbine Pit Condensate extraction plant and gland heater in position 6/1/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161211 Image from untitled photo album, General view of Station from West 29/9/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161212 Image from untitled photo album, Excavation for 74" C.W. pipes. South pipe extended level with existing North pipe. 30/12/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161213 Image from untitled photo album, 3A and 3B Bunker Conveyors viewed from temporary tower at East end of Bailey Bridge 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161214 Image from untitled photo album, General View of Station from South Side. Brickwork complete. 6/1/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161215 Image from untitled photo album, 1B Tunnel Conveyor complete. 1A under construction. 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161216 Image from untitled photo album, Annexe 30.0' level taken from G.B. Tower. No. 1 H.P. Heater in position. No. 2 being lifted. 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161217 Image from untitled photo album, General View of 2A and 2B Gravity Bucket Elevators at 149'6" O.D. level 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161218 Image from untitled photo album, Ash Bunker Hopper complete. Side Walls under construction. 19/8/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161219 Image from untitled photo album, Economiser Being Erected 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161220 Image from untitled photo album, Upper Furnace Wall Riser Tubes. Side and Rear Walls Complete, Front Wall being erect 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161221 Image from untitled photo album, Plant Supporting Steelwork in S. Pits 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161222 Image from untitled photo album, Erection of Superheater by-pass and Economiser Front Wall casing 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161223 Image from untitled photo album, General View of Ash House showing Pump Plinths and Reservoir and Sump 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161224 Image from untitled photo album, General View of Station from South Brickwork 149'6" OD level 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161225 Image from untitled photo album, No. 1 Generator Transformer Arriving on Site 2/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161226 Image from untitled photo album, Construction of Rail access bridge to Turbine Room 31/10/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161227 Image from untitled photo album, No. 1 Generator Transformer Mounted on Rails in Moat 7/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161228 Image from untitled photo album, Roof of Dust Bunker under Construction. Ash Hopper Complete. 29/11/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161229 Image from untitled photo album, Erection of Upper Furnace and Convection tubes complete 29/11/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161230 Image from untitled photo album, No. 1 Transformer being skidded into Transformer House 28/2/1950 Item Level
On-line Digital Images On-line Digital Images SC 2161231 Image from untitled photo album, General View from Annexe Roof 19/8/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161232 Image from untitled photo album, Air Heaters viewed from North-East corner. Air and Gas ducting being erected. 29/11/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161233 Image from untitled photo album, Nos A and 3B Bunker Conveyors 29/9/1949 Item Level