Photo album, untitled, Volume 155

PA 123/155

Description Photo album, untitled, Volume 155

Date 29/4/1949 to 17/6/1949

Collection Scottish Power

Catalogue Number PA 123/155

Category Print Room

Scope and Content Images showing construction of the site, including: steel work erection and main building; roof construction; boiler furnace; turbine hall foundations and turbo-alternator steel work; condenser transportation; circulating water pump house pit; no. 3A, 3B and bunker conveyors; gravity bucket elevator steel work; ash sump foundations; ash and dust bunker columns; unit transformer; resistor house excavation.

Accession Number 1992/43

External Reference Portobello Vol 155

Permalink http://canmore.org.uk/collection/432811

Collection Hierarchy - Batch Level

Preview Category Catalogue Number Title Date Level
On-line Digital Images On-line Digital Images SC 2161158 Image from untitled photo album, General View of Furnace Locking drum from 97'6" OD level. Backstays in position. 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161159 Image from untitled photo album, Columns for ash and dust bunkers under construction 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161160 Image from untitled photo album, No. 3A and 3B Bunker Conveyors almost complete 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161161 Image from untitled photo album, Fitting of Belt on No. 4M reconstructed conveyor 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161162 Image from untitled photo album, Structural Steelwork for Gravity Bucket conveyors complete. Construction of ash reservoir in foreground. 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161163 Image from untitled photo album, Construction of Columns under Flue 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161164 Image from untitled photo album, North - Light roof almost complete. General view of South Side of Station in Background 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161165 Image from untitled photo album, Three Reactors in Position 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161166 Image from untitled photo album, General View of South Section - Pump House Pit 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161167 Image from untitled photo album, Arrival of first section of condenser on site 16/6/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161168 Image from untitled photo album, Arrival of first section of condenser on site 18/6/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161169 Image from untitled photo album, Flues at sides of casings under construction 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161170 Image from untitled photo album, Arrival of First Section of Condenser on site 17/6/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161171 Image from untitled photo album, Structural Steelwork for No. 3B Bunker Conveyor Complete. Belt Stripper being erected. 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161172 Image from untitled photo album, Erection of Turbo-Alternator. Steelwork almost complete. 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161173 Image from untitled photo album, Condensor and Foundations looking South 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161174 Image from untitled photo album, North Light roof Shuttering being erected 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161175 Image from untitled photo album, Excavation of Resistor House complete 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161176 Image from untitled photo album, Non Unit Transformer on Raft adjacent to West Boundary Wall 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161177 Image from untitled photo album, Excavation Complete. Reservoir foundations under construction. 29/4/1949 Item Level