Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Pricing Change

New pricing for orders of material from this site will come into place shortly. Charges for supply of digital images, digitisation on demand, prints and licensing will be altered. 

 

Upcoming Maintenance

Please be advised that this website will undergo scheduled maintenance on the following dates:

Thursday, 9 January: 11:00 AM - 3:00 PM

Thursday, 23 January: 11:00 AM - 3:00 PM

Thursday, 30 January: 11:00 AM - 3:00 PM

During these times, some functionality such as image purchasing may be temporarily unavailable. We apologise for any inconvenience this may cause.

 

Photo album, untitled, Volume 155

PA 123/155

Description Photo album, untitled, Volume 155

Date 29/4/1949 to 17/6/1949

Collection Scottish Power

Catalogue Number PA 123/155

Category Print Room

Scope and Content Images showing construction of the site, including: steel work erection and main building; roof construction; boiler furnace; turbine hall foundations and turbo-alternator steel work; condenser transportation; circulating water pump house pit; no. 3A, 3B and bunker conveyors; gravity bucket elevator steel work; ash sump foundations; ash and dust bunker columns; unit transformer; resistor house excavation.

Accession Number 1992/43

External Reference Portobello Vol 155

Permalink http://canmore.org.uk/collection/432811

Collection Hierarchy - Batch Level

Preview Category Catalogue Number Title Date Level
On-line Digital Images On-line Digital Images SC 2161159 Image from untitled photo album, Columns for ash and dust bunkers under construction 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161160 Image from untitled photo album, No. 3A and 3B Bunker Conveyors almost complete 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161161 Image from untitled photo album, Fitting of Belt on No. 4M reconstructed conveyor 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161162 Image from untitled photo album, Structural Steelwork for Gravity Bucket conveyors complete. Construction of ash reservoir in foreground. 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161163 Image from untitled photo album, Construction of Columns under Flue 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161164 Image from untitled photo album, North - Light roof almost complete. General view of South Side of Station in Background 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161165 Image from untitled photo album, Three Reactors in Position 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161166 Image from untitled photo album, General View of South Section - Pump House Pit 31/5/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161167 Image from untitled photo album, Arrival of first section of condenser on site 16/6/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161168 Image from untitled photo album, Arrival of first section of condenser on site 18/6/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161169 Image from untitled photo album, Flues at sides of casings under construction 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161170 Image from untitled photo album, Arrival of First Section of Condenser on site 17/6/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161171 Image from untitled photo album, Structural Steelwork for No. 3B Bunker Conveyor Complete. Belt Stripper being erected. 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161172 Image from untitled photo album, Erection of Turbo-Alternator. Steelwork almost complete. 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161173 Image from untitled photo album, Condensor and Foundations looking South 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161174 Image from untitled photo album, North Light roof Shuttering being erected 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161175 Image from untitled photo album, Excavation of Resistor House complete 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161176 Image from untitled photo album, Non Unit Transformer on Raft adjacent to West Boundary Wall 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161177 Image from untitled photo album, Excavation Complete. Reservoir foundations under construction. 29/4/1949 Item Level
On-line Digital Images On-line Digital Images SC 2161158 Image from untitled photo album, General View of Furnace Locking drum from 97'6" OD level. Backstays in position. 29/4/1949 Item Level

People and Organisations

Events