Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

View of nos. 1 and 2 shafts and winding engine house from North West, Cardowan Colliery

LA 4396

Description View of nos. 1 and 2 shafts and winding engine house from North West, Cardowan Colliery

Date 26/9/1983

Catalogue Number LA 4396

Category Photographs and Off-line Digital Images

Copies SC 376874

Scope and Content Shafts 1 and 2 of Cardowan Colliery, Lanarkshire Cardowan Colliery was opened in 1930 by Nimmo and Dunlop. In its heyday in 1959, its 1970 workers produced 1,550 tons of coal per day from its two shafts. It was closed in 1983 after a serious fire caused excessive levels of methane in the pit. On the left are the reconstructed headframes of Shafts 1 and 2. The cable looped over the pulley is driven by the steam-powered winding-engines in the Winding-Engine House (right). The nearest, Number 1, is the downcast shaft. By law, every mine must have two shafts so that miners can escape if one shaft is blocked. This also ensures proper ventilation of the mine. Fresh air is pumped into the downcast shaft and stale air is expelled from the upcast shaft. Source: RCAHMS contribution to SCRAN.

Permalink http://canmore.org.uk/collection/376369

People and Organisations

Events

Attribution & Licence Summary

Attribution: © RCAHMS

You may: copy, display, store and make derivative works [eg documents] solely for licensed personal use at home or solely for licensed educational institution use by staff and students on a secure intranet.

Under these conditions: Display Attribution, No Commercial Use or Sale, No Public Distribution [eg by hand, email, web]

Full Terms & Conditions and Licence details

MyCanmore Text Contributions