Grudie Bridge Power Station Inflow Pipe, part of Conon Hydro-Electric Power Scheme
DP 445831
Description Grudie Bridge Power Station Inflow Pipe, part of Conon Hydro-Electric Power Scheme
Date 1/3/2011 to 31/3/2011
Catalogue Number DP 445831
Category On-line Digital Images
Scope and Content This is the inflow pipe of the tunnel leading from Loch Fannich to Grudie Bridge Power Station. It is located on the A832 road. The power station at Grudie Bridge was commissioned in 1951 and has an operating capacity of 19 MWs.
Accession Number 2024/57
External Reference 005-000-009-741-C, 005-000-009-273-R
Permalink http://canmore.org.uk/collection/2768565
File Format (JPG) JPEG bitmap
Attribution & Restricted Use Summary
Attribution: © SCRAN Licence
Licence Type: Limited
You may solely view this material on the Canmore Site. No other use is permitted.