Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

"Elevation, plan and dimensions of bridges in the Highlands of Scotland, made and constructed under the direction of the Commissioners for Highland roads and bridges 1803-1821" Thomas Telford, enginee ...

RCD 31/2

Description "Elevation, plan and dimensions of bridges in the Highlands of Scotland, made and constructed under the direction of the Commissioners for Highland roads and bridges 1803-1821" Thomas Telford, engineer; Engraved by Edmund Turrell; Drawn by R H Palmer Covers the following bridges: Bridge at Greystones, Latheran Wheel Bridge, Balnagown Bridge, Allness Bridge, Easter Fearn, Bridge over the Varrar, Cannech Bridge, Bridge over the Diak, Bridge for the Aultmore, Sheal Bridge, Cros Bridge, Bridge over the river Moriston, Borlam Bridge, Bridge of Ballachandraine, Adrie Bridge, Calder Bridge, Kirk Laggan Bridge, Bridge for the Water of Roy, Spean Bridge, Bonar Bridge over the Dornoch Firth, Contin Bridge, Craig Ellachie, Alford Bridge over the river Don, Wick Bridge, Helmsdale Bridge, Aultnaharrar Bridge over the Tarrie, Conan Bridge, Dunkeld Bridge over the river Tay, Lovat Bridge, Potarch Bridge over river Dee, Torgoyle Bridge, Balater Bridge over river Dee, Strathfleet Mound and Bridge, Fairness Bridge, Bridge and river Nethy.

Date 1821

Catalogue Number RCD 31/2

Category Prints and Drawings

Copies RCD 31/2 P

Scale 1":68'

Medium Photostat

Permalink http://canmore.org.uk/collection/233766

People and Organisations

Events

Attribution & Licence Summary

Attribution: © RCAHMS

You may: copy, display, store and make derivative works [eg documents] solely for licensed personal use at home or solely for licensed educational institution use by staff and students on a secure intranet.

Under these conditions: Display Attribution, No Commercial Use or Sale, No Public Distribution [eg by hand, email, web]

Full Terms & Conditions and Licence details

MyCanmore Text Contributions