On-line Digital Images |
DP 395029 |
Interior. Brewhouse, 2nd floor. Grist Cases nos. 1 and 2. Older part of the site showing damage from 1990s fire on roof timbers |
18/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395035 |
Interior. Brewhouse, 1st floor, Copper house. View of two of the three copper vessels. The coppers were made in Prestonpans in 1998. |
18/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395046 |
Interior. Brewhouse, 2nd floor. Grist Cases nos. 1 and 2 area. Detail of window. |
18/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395086 |
Interior. Brewhouse, 1st floor, Fermentation Rooms/ Tanks area. View from SW |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395105 |
Interior. Kegging Hall. Keg filling plant area. |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395067 |
Interior. Brewhouse, 1st floor. View of emergency shower in Fermentation Tank area in case of caustic foam spillage (used in cleaning of area). |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395072 |
Brewhouse. View of Hop Store adjacent to Coppers area. |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395187 |
Interior. Conditioning Block. View |
20/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395202 |
View from south. |
20/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395169 |
Interior. View of Engineers Workshop. |
20/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395037 |
Interior. Brewhouse, ground floor, copper house. Fireboxes below each of the three copper vessels on the floor above. These were converted from coal to gas in 1998. |
18/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395039 |
Interior. Brewhouse, ground floor, Copper House.View of fireboxes below gas-fired copper vessels on the floor above. |
18/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395041 |
Interior. Brewhouse, ground floor. The stairs on the left give access to the 1st floor containing the Copper vessels (the Copper House) and the Mash Tuns. |
18/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395034 |
Interior. Brewhouse, 1st floor, Copper house. View of copper vessel lid. The copper was made in Prestonpans in 1998 and was replaced after a fire in the 1990s. |
18/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395084 |
Interior. Conditioning Block, NE part of site. View of conical Fermentation Vessels. |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395103 |
Interior. Kegging Hall. View of Bright Beer Tank 2 (BBT2) which held the beer ready to be kegged. Kegs are steel vessels and can hold hold beer pressurised with carbon dioxide gas. |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395100 |
Interior. Racking and Conditioning area. View of tanks containing beer run of from the Fermentation Tanks and ready to be racked off into conditioning casks. |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395071 |
Brewhouse. View of W part of the brewhouse showing the chimney which would have served the coppers' fireboxes on the ground floor of the building. |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395056 |
Interior. Brewhouse, 1st floor, Coppers Nos 1-3 area. View of windows along railway track side. |
18/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395079 |
Interior. Racking and Conditioning. Pilot Brewery. |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395073 |
Interior. Brewhouse, Hop Store. View of list of hops stored. |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395030 |
Interior. Brewhouse, 2nd floor. Grist Cases nos. 1 and 2 area. Older part of the site showing damage from 1990s fire on roof timbers and shoe of now removed belt drive shaft. |
18/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395106 |
Interior. Kegging Hall. Racking area. |
19/1/2023 |
Item Level |
|
On-line Digital Images |
DP 395170 |
Interior. Conditioning Block. View of conical fermentation vessels from mezzanine level. |
20/1/2023 |
Item Level |