551 1/4/9/198
Description Lady Victoria Colliery, Newtongrange
Date 14/6/1993
Collection Records of the Royal Commission on the Ancient and Historical Monuments of Scotland (RCAHMS), Edinbu
Catalogue Number 551 1/4/9/198
Category All Other
Permalink http://canmore.org.uk/collection/1495329
Collection Hierarchy - Sub-Group Level
> Group Level (551 1/4) National Survey Programmes
>> Sub-Group Level (551 1/4/9) Industrial Survey Programme
>>> Sub-Group Level (551 1/4/9/198) Lady Victoria Colliery, Newtongrange
Preview | Category | Catalogue Number | Title | Date | Level |
---|---|---|---|---|---|
Photographs and Off-line Digital Images | D 58699 | Newtongrange, Lady Victoria Colliery, Pithead Building (tub Circuit, Tippler Section, Picking Tables) Interior view from W at ground level beneath the Picking Tables. Railway wagons passed through this area and were filled from hoppers and conveyors above | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58701 | Newtongrange, Lady Victoria Colliery, Dense Medium Plant Dense Medium Plant: interior view from SW at first-floor level, showing bottom half of agitating vessels situated at the top of the building | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58702 | Newtongrange, Lady Victoria Colliery, Dense Medium Plant Dense Medium Plant: interior view from SW of the E of the two agitating vessels situated at the top of the building | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58703 | Newtongrange, Lady Victoria Colliery, Dense Medium Plant Dense Medium Plant: detailed view looking into the E of the two agitating vessels in the top floor of the building | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58704 | Newtongrange, Lady Victoria Colliery, Dense Medium Plant Dense Medium Plant: view from N at the top of the building looking over the W of the two agitating vessels (electric motor missing) | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58705 | Newtongrange, Lady Victoria Colliery, Pithead Building (tub Circuit, Tippler Section, Picking Tables) Interior view from SE at first-floor level at the S end of the pithead complex showing Picking Tables in the foreground | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58706 | Newtongrange, Lady Victoria Colliery, Pithead Building (tub Circuit, Tippler Section, Picking Tables) Interior view from NW at first-floor level showing conveyor leading from Picking Tables into the Dense Medium Plant (left) | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58707 | Newtongrange, Lady Victoria Colliery, Pithead Building (tub Circuit, Tippler Section, Picking Tables) Interior view from SW at first-floor level looking from the SW corner of the colliery surface buildings towards the Picking Tables (right) | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58709 | Newtongrange, Lady Victoria Colliery, South Elevator Conveyor System Elevated exterior view from W showing renovated gantries elevators and conveyors on S end of the pithead complex | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58710 | Newtongrange, Lady Victoria Colliery, Coal Elevator Shed and Hopper Elevated view from S looking towards the headgear, with the brick-built Hoppers to the left and the Old Washer to the right | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58711 | Newtongrange, Lady Victoria Colliery, Pithead Building (tub Circuit, Tippler Section, Picking Tables) View from S of the colliery headgear, with the corrugated sheet-metal roofs and upper walls of the Picking Tables and Tub Circuit buildings in the foreground | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58715 | Newtongrange, Lady Victoria Colliery, Boiler House and Chimney (Original Boiler House) View from NW of Boilerhouse Chimney and rear of Boilerhouse (left), with former Power Stations (background centre) | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58717 | Newtongrange, Lady Victoria Colliery, Fines Treatment Plant and Thickener General view from W of north end of colliery, showing (left to right) the Fines Treatment Plant, Woodroad Stores, Boilerhouse Chimney, and (extreme right) the N end of the Tub Circuit building | 7/9/1999 | Item Level | |
Photographs and Off-line Digital Images | D 58663 | View from SE of S end and E side of Old Washer, prior to renovation | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58665 | View from S of S gables of brick-built Hopper (Left) and Old Washer (right), prior to restoration | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58667 | View from SW of S gables of brick-built Hopper (Left) and Old Washer (right), prior to restoration. The view also shows the railway lines emerging from the lower level of the pit-head complex. | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58669 | General view from SW of S end of the colliery, showing the external gantries and conveyors prior to restoration. The damaged gable of the Picking Tables area is visible (left), as is the three-storeyed Dense Medium Plant (centre), and the Hopper and Old Washer (far right) | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58673 | Newtongrange, Lady Victoria Colliery, South Elevator Conveyor System General view from SW of S end and W side of the colliery, showing the external gantries and conveyors prior to restoration. The storm-damaged SW corner of the colliery (housing the Picking Tables area) is visible (left), as is the three-storeyed Dense Medium Plant (centre right), and the Hopper and Old Washer (far right) | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58670 | Newtongrange, Lady Victoria Colliery, Pithead Building (Tub Circuit, Tippler Section, Picking Tables) Detailed interior view from W looking through the arcades of brick arches separating the railway sidings passing under the colliery's surface buildings. Wagons were filled from conveyors and hoppers in the floors above | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58671 | Newtongrange, Lady Victoria Colliery, Pithead Building (Tub Circuit, Tippler Section, Picking Tables) Diagonal interior view from NE looking through arcades of brick arches separating the railway sidings passing under the colliery's surface buildings. Wagons were filled from conveyors and hoppers in the floors above, which also housed the Picking Tables | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58672 | Newtongrange, Lady Victoria Colliery, Pithead Building (Tub Circuit, Tippler Section, Picking Tables) Detailed interior view from E looking through the arcades of brick arches separating the railway sidings passing under the colliery's surface buildings. Wagons were filled from conveyors and hoppers in the floors above, which contained the Picking Tables | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58664 CN | View from SE of S end and E side of Old Washer, prior to renovation | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58666 CN | View from S of S gables of brick-built Hopper (Left) and Old Washer (right), prior to restoration | 14/6/1993 | Item Level | |
Photographs and Off-line Digital Images | D 58668 CN | View from SW of S gables of brick-built Hopper (Left) and Old Washer (right), prior to restoration. The view also shows the railway lines emerging from the lower level of the pit-head complex. | 14/6/1993 | Item Level |