Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Village Bay, helipad construction

551 462/2/1/2

Description Village Bay, helipad construction

Collection Stuart Murray

Catalogue Number 551 462/2/1/2

Category All Other

Accession Number 2013/93

Permalink http://canmore.org.uk/collection/1360513

Collection Hierarchy - Batch Level

Collection Level (551 462) Stuart Murray

Group Level (551 462/2) St Kilda

>> Sub-Group Level (551 462/2/1) Hirta

>>> Batch Level (551 462/2/1/2) Village Bay, helipad construction

Preview Category Catalogue Number Title Date Level
On-line Digital Images On-line Digital Images DP 166004 1974-01 Hardened helicopter pad & makeshift petrol store. 1974 Item Level
On-line Digital Images On-line Digital Images DP 166005 1974-02 Ground clearance around new helicopter pad. 1974 Item Level
On-line Digital Images On-line Digital Images DP 166006 1996-01 Before the clear up. Secure storage area, with gate and barbed wire overhangs. 1996 Item Level
On-line Digital Images On-line Digital Images DP 166007 1996-02 Before the clear up. 1996 Item Level
On-line Digital Images On-line Digital Images DP 166008 1997-01 Lifting embedded concrete prior to removal by LSL. 1997 Item Level
On-line Digital Images On-line Digital Images DP 166009 1997-02. Clearing 1970s rubble which had been half buried in the storm beach. 1997 Item Level
On-line Digital Images On-line Digital Images DP 166037 1997-03 Quarry, concrete base before landscaping. 1997 Item Level
On-line Digital Images On-line Digital Images DP 166038 1997-04 Quarry, concrete base after landscaping. 1997 Item Level
On-line Digital Images On-line Digital Images DP 166039 1997-05 Pottery from top edge of eroding cliff, between gabions and fuel tanks. 1997 Item Level
On-line Digital Images On-line Digital Images DP 166040 1998-01 Result of the clear up, late summer 1998. 1998 Item Level
On-line Digital Images On-line Digital Images DP 166041 2009-01 Landscaped quarry. 2009 Item Level
On-line Digital Images On-line Digital Images DP 166079 2009-02 Landscaped quarry. 2009 Item Level
On-line Digital Images On-line Digital Images DP 166082 2009-3 Concrete base under rubble, extreme bottom right. Mounds at left & right end, against rock face, created in 1993/94. 2009 Item Level
On-line Digital Images On-line Digital Images DP 166087 2009-04 Storage area. 2009 Item Level
On-line Digital Images On-line Digital Images DP 166106 2009-05 Village Bay. 2009 Item Level
On-line Digital Images On-line Digital Images DP 166128 2010-01 Regrowth over bulldozed ground. Outer rampart created in 1974. 2010 Item Level
On-line Digital Images On-line Digital Images DP 166129 2012-01 Storage area with new boulder pile since 2009. 1974 Item Level
On-line Digital Images On-line Digital Images DP 166143 2012-03 Close up of boulder line (not an old dyke or bank). 2012 Item Level

People and Organisations

Events