 |
On-line Digital Images |
SC 869483 |
View from N of construction work, taken from Left Bank upstream of dam.
Copy of negative, Tummel Valley, Box 879/1, Contract No. 17, Ser. No. 27. |
9/3/1949 |
Item Level |
 |
On-line Digital Images |
SC 869485 |
Interior view of drum from right hand end, Clunie Dam, Loch Tummel.
|
9/11/1949 |
Item Level |
 |
On-line Digital Images |
SC 869488 |
View of the construction of the Clunie Pipeline, showing Trifurcation.
Copy of negative, Tummel Valley, Box 871/1, Contract No. 18, Ser. No. 21. |
5/4/1949 |
Item Level |
 |
On-line Digital Images |
SC 869493 |
General View of the interior of the Power Station under construction.
Copy of negative, Tummel Valley, Box 870/2, Contract No. 14, Ser. No. 27. |
9/3/1949 |
Item Level |
 |
On-line Digital Images |
SC 869763 |
Interior of Power Station.
Copy of negative, Tummel Valley, Box 889/1, Contract No. 17, Ser. No. 71. |
6/2/1950 |
Item Level |
 |
On-line Digital Images |
SC 868635 |
View from NW showing excavation of the Surge Shaft.
Copy of negative, Strathfarrar, Box 871/2, Contract 101, Plate 44. |
5/5/1960 |
Item Level |
 |
On-line Digital Images |
SC 869500 |
View from S during construction.
Copy of negative, Tummel Valley, Box 864/2, Contract No. 14, Ser. No. 71. |
7/2/1950 |
Item Level |
 |
On-line Digital Images |
SC 868671 |
General view from SW showing construction of Intake Bellmouth and Gate Tower.
Copy of negative, Strathfarrar, Box 870/1, Contract 101, Plate 249. |
2/10/1962 |
Item Level |
 |
On-line Digital Images |
SC 868680 |
Interior.
View of construction work in the Machine Chamber. Concreting surround to No. 1 Machine Spiral casing, intermediate stage.
Copy of negative, Strathfarrar, Box 870/1, Contract 101, Plate 250. |
31/10/1962 |
Item Level |
 |
On-line Digital Images |
SC 868683 |
Interior.
View of Machine Chamber from Loading Bay.
Copy of negative, Strathfarrar, Box 870/1, Contract 101, Plate 269. |
4/4/1963 |
Item Level |
 |
On-line Digital Images |
SC 869242 |
Upstream view from N bank showing granite-pitching in bucket.
Copy of negative, Mullardoch-Fasnakyle-Affric, Box 1045/1, Contract No. 10, Plate No. 252. |
4/10/1950 |
Item Level |
 |
On-line Digital Images |
SC 868647 |
Interior.
View showing Erection of Guyrex Shutter at Intake.
Copy of negative, Strathfarrar, Box 871/2, Contract 101, Plate 72. |
5/1/1961 |
Item Level |
 |
On-line Digital Images |
SC 868654 |
Interior.
View showing Concrete Conveyor and Placer for Tunnel Shutter.
Copy of negative, Strathfarrar, Box 871/2, Contract 101, Plate 73. |
5/1/1961 |
Item Level |
 |
On-line Digital Images |
SC 868656 |
View from S showing start of L.P. Tunnel lining at Intake [NGR: NH c. 2029 3941].
Copy of negative, Strathfarrar, Box 871/2, Contract 101, Plate 90. |
3/4/1961 |
Item Level |
 |
On-line Digital Images |
SC 868659 |
Interior.
View from S showing Machine Chamber Roof during construction.
Copy of negative, Strathfarrar, Box 843/1, Contract 101, Plate 123. |
2/8/1961 |
Item Level |
 |
On-line Digital Images |
SC 868666 |
View from W showing construction of Gate Shaft at Intake [NGR: NH c. 2029 3941].
Copy of negative, Strathfarrar, Box 843/1, Contract 101, Plate 154. |
19/12/1961 |
Item Level |
 |
On-line Digital Images |
SC 868667 |
General view from SW showing construction of Intake Bellmouth and Gate Tower.
Copy of negative, Strathfarrar, Box 870/1, Contract 101, Plate 240. |
4/9/1962 |
Item Level |
 |
On-line Digital Images |
SC 869213 |
View of excavation for North half of Generating Station building, also showing portals of South and Centre pipe tunnels.
Copy of negative, Mullardoch-Fasnakyle-Affric, Box 840/2, Contract No. 10, Plate No. 66. |
1/7/1948 |
Item Level |
 |
On-line Digital Images |
SC 869224 |
View along centre line showing excavation to final levels for Blocks Nos. 12, 13, 14.
Copy of negative, Mullardoch-Fasnakyle-Affric, Box 1103/2, Contract No. 10, Plate No. 103. |
2/3/1949 |
Item Level |
 |
On-line Digital Images |
SC 869238 |
Fasnakyle Tunnel. Surge Shaft lining completed [NGR: NH 30381 29253].
Copy of negative, Mullardoch-Fasnakyle-Affric, Box 1045/1, Contract No. 10, Plate No. 245. |
5/9/1950 |
Item Level |
 |
On-line Digital Images |
SC 869241 |
View from SE showing Turbine House and Administration Block under construction.
Copy of negative, Mullardoch-Fasnakyle-Affric, Box 1045/1, Contract No. 10, Plate No. 247. |
5/9/1950 |
Item Level |
 |
On-line Digital Images |
SC 869027 |
View from S [from chainage 690 S] of South Wing under construction.
Copy of negative, Mullardoch-Fasnakyle-Affric, Box 873/1, Contract No. 9, Plate No. 125. |
2/3/1950 |
Item Level |
 |
On-line Digital Images |
SC 869247 |
Interior.
Fasnakyle Generating Station. Turbine house. No. 3 stator erected, No. 2 plinth concreted and No. 1 spiral casing in position.
Copy of negative, Mullardoch-Fasnakyle-Affric, Box 1042/1, Contract No. 10, Plate No. 275. |
11/12/1950 |
Item Level |
 |
On-line Digital Images |
SC 869250 |
Upstream view from N bank showing concreting of bridge.
Copy of negative, Mullardoch-Fasnakyle-Affric, Box 1042/1, Contract No. 10, Plate No. 297. |
2/4/1951 |
Item Level |