|
Prints and Drawings |
SPE ENG/77/2/9/8 |
Married Quarters, Tower Block (Block F).
Sketches including details of proposed design for tower top, precast stair, and bridge between tower and maisonettes. Sketch perspectives showing exterior and interior views.
|
c. 1961 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/9 |
Married Quarters, Tower Block (Block F).
Sketches including plans, sections, elevations and details including lighting boom, and proposed revision to top of tower. |
c. 7/1960 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/31 |
Married Quarters, Tower Block (Block F).
Details including engineers' room and lavatory in basement stores, engineers' lavatory drainage sump, engineers' escape stair, spiral escape stair from basement, fire-escape cat ladder from basement, and details of circular stair.
|
c. 1/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/10 |
Married Quarters, Tower Block (Block F).
Sketches including details of duct at 5th level adjacent to sink units in flats, proposed refuse chute vent, proposed annunciator panel to lifts (Level 4), louvres for the base of the tower, jointing studies, proposed post box installation, and vent to electrical transformer room. |
c. 1/1963 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/11 |
Married Quarters, Tower Block (Block F).
Sketches including details of the top of the tower, and expansion joints. Also contains isometric projections showing levels 34 and 52, and the west end of the site showing blocks E, F and G. |
c. 6/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/12 |
Married Quarters, Tower Block (Block F).
CPM Network programme, outlline specification, list of drawings, list of decimals of a foot from 1/16 inch to 11 15/16 inch, and drawing schedule (programme agreed with Q.S.). |
c. 1961 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/32 |
Married Quarters, Tower Block (Block F).
Details including flue cleaning doors, oil store doors, access door, ironmongery in basement, electrical rooms, louvre details, engineers' stair, electrical room vent, oil room vent, and spiral stair from engineers' room in the basement. |
c. 2/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/41 |
Married Quarters, Tower Block (Block F).
Details including kitchens for flat types 'b' and 'c', removable panels to ducts in bathrooms, and caretaker's flat.
|
c. 12/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/13 |
Married Quarters, Tower Block (Block F).
Plans and layouts of electrical services for basement level (level 1) at 35 ft. Plans, and layouts of electrical services for reflected ceiling at the underside of 52 ft.
|
c. 2/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/33 |
Married Quarters, Tower Block (Block F).
Details including pipe ducts to boilers and stand-by generator, and external louvres for level 3. |
c. 5/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/34 |
Married Quarters, Tower Block (Block F).
Details including ventilation grilles in basement, handrails, engineers' stair, caretaker's flat, launderette layout for level 3, and duct covers. |
c. 1/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/14 |
Married Quarters, Tower Block (Block F).
Plans and layouts of electrical services for level 3 at 52 ft. |
c. 2/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/15 |
Married Quarters, Tower Block (Block F).
Plans and layouts of electrical services for level 4 at 61-65 ft. Reflected ceiling plan at 65 ft. |
c. 2/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/30 |
Married Quarters, Tower Block (Block F).
Long sections showing the whole tower block. |
3/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/1 |
Married Quarters, Tower Block (Block F).
Sketches including plans, and sections of flat layout and furniture layout. |
c. 1961 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/35 |
Married Quarters, Tower Block (Block F).
Details including refuse storage room, refuse chute details, refuse room door, and main stair termination for levels 3, 4 and 5.
|
c. 11/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/36 |
Married Quarters, Tower Block (Block F).
Details including refuse chute cut off, details of duct covers, entrance steps and bridges from Knightsbridge at level 4, and entrance lobby.
|
c. 1/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/37 |
Married Quarters, Tower Block (Block F).
Details including entrance lobby (level 4), escape stair termination (levels 4 and 5), entrance hall doors, and bridge link to riding school (block E). |
c. 1/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/45 |
Married Quarters, Tower Block (Block F).
Details including escape stair, secondary staircase, handrail to escape stairwell, box stores for levels 5 to 32, glazed screen, spandrel panel, and sample beam and column. |
c. 8/1964 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/46 |
Married Quarters, Tower Block (Block F).
Details including taper to base of spine walls, eyebolt anchorages, precast units in stairwells, precast window, communal box stores, and head of main staircase. |
c. 9/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/2 |
Married Quarters, Tower Block (Block F).
Sketches including section, elevations and details. |
c. 1961 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/47 |
Married Quarters, Tower Block (Block F).
Details including head of secondary staircase and windows for level 33. |
c. 1/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/38 |
Married Quarters, Tower Block (Block F).
Details including telephone lobby, handrail, windows (levels 1-4), and secondary staircase.
|
c. 1/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/9/3 |
Married Quarters, Tower Block (Block F).
Sketch details. |
c. 1961 |
Batch Level |