|
Prints and Drawings |
SPE ENG/77/2/4/4 |
Stables (Block A)
Sketches including elevations and details. |
c. 1961 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/26 |
Stables (Block A)
Details including drainage, access doors to trooplines, and escape doors.
|
c. 8/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/27 |
Stables (Block A)
Details including colic and loose box doors, doors to forage stores and saddle and tack rooms, and metal gate and grille
|
c. 8/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/40 |
Stables (Block A)
Details including saddle and tack rooms lockers, ventilation louvre to forage lift, oat hopper, dressing room area, frames for horse name plates, bales to troopline doors, forage bins, horseshoe rods storage racks, the household division troopline notice board, and the household division daily detail board. |
c. 6/1970 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/41 |
Stables (Block A)
Details including tack lockers, revision to dung tunnel brackets, bales to dung chute areas in trooplines, bales to stalls, plate to water trough and veterinary yard, hose reel hooks, dung chute cut off doors, hook boards, casing to macerator control panel, and gate stop to fire-escape ramp.
|
c. 9/1970 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/9 |
Stables (Block A)
Sketch details relating to horse stalls. |
c. 8/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/16 |
Stables (Block A)
Plan and sections of plant room. Details of air in-take housings. |
c. 3/1967 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/32 |
Stables (Block A)
Details including metal louvres, hose reel recess, drainage grooves, dung chutes, stall partitions, schedule of quantities, and loose boxes.
|
c. 6/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/33 |
Stables (Block A)
Details including stall and loose box partitions.
|
c. 7/1967 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/42 |
Stables (Block A)
Details including proposals for geared rolling shutters with fusible link, troopline access doors, tethering rings, and pillar chains and hooks. |
c. 12/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/34 |
Stables (Block A)
Details including colic box, door details, doors to tack rooms, fusible link roller shutter, door schedule, forage stores, tethering rings, partition brick wall conditions, and troopline access doors.
|
c. 11/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/35 |
Stables (Block A)
Details including door openings in brickwork, cut off screens, roof gutters, saddle and tack room, and safety barrier and cat ladder to dung tunnel.
|
c. 11/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/5 |
Stables (Block A)
Sketches including details. |
c. 1961 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/6 |
Stables (Block A)
Sketches including details. |
c. 1961 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/10 |
Stables (Block A)
Plans of level 1 and 2. |
c. 8/1966 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/7 |
Stables (Block A)
Sketches including sections, elevations, and details. |
c. 1961 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/11 |
Stables (Block A)
Plans of levels 2 and 3. |
c. 2/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/12 |
Stables (Block A)
Plans of levels 3, 4 and roof. |
c. 12/1964 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/19 |
Stables (Block A)
Plans of levels 2 and 3, roof plan, and sections. |
c. 3/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/20 |
Stables (Block A)
Plans, sections and details including vet line loose boxes, escape door and dung tunnel. |
c. 3/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/28 |
Stables (Block A)
Details including door schedule, pavement lights to smoke extracts, and forge lift.
|
c. 11/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/1 |
Stables (Block A)
Sketches. |
c. 1961 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/21 |
Stables (Block A)
Plans of link block and sections. |
c. 4/1965 |
Batch Level |
|
Prints and Drawings |
SPE ENG/77/2/4/22 |
Stables (Block A)
Plans of link block and details of saddle rooms, straw drying room, feed boiler rooms and spiral stair. |
c. 8/1965 |
Batch Level |