On-line Digital Images |
SC 1680506 |
RCAHMS Aerial Photography |
Aerial view. |
1991 |
Item Level |
|
|
On-line Digital Images |
SC 1680507 |
RCAHMS Aerial Photography |
Aerial view. |
1991 |
Item Level |
|
|
On-line Digital Images |
SC 1680508 |
RCAHMS Aerial Photography |
Aerial view. |
1991 |
Item Level |
|
|
On-line Digital Images |
SC 1680509 |
RCAHMS Aerial Photography |
Aerial view. |
1991 |
Item Level |
|
|
On-line Digital Images |
SC 1680510 |
RCAHMS Aerial Photography |
Aerial view. |
1991 |
Item Level |
|
|
On-line Digital Images |
DP 323342 |
Records of CFA Archaeology Ltd, archaeologists, Musselburgh, East Lothian, Scotland |
Zipped folder containing field survey photographs taken by team A, Borders Railway Project |
1/3/2009 |
Item Level |
|
|
On-line Digital Images |
SC 2591092 |
|
General view from SW, showing offices (left) and baths (right). No.2 shaft winding tower (left) and no.1 shaft winding towr (right) are in the background. |
1/6/1989 |
Item Level |
|
|
On-line Digital Images |
SC 2591093 |
|
Interior.
General view on top floor of No. 1 shaft tower showing winding engines, with (right to left) the electric motor, gearbox and cable drum of the 1 B winder. Each of the two winders is equipped with 14-tonne skips and are together designed to lift 430 tonnes of coal per hour. The counterweights have rope guides. |
1/6/1989 |
Item Level |
|
|
On-line Digital Images |
SC 2591094 |
|
Interior.
Detail of one of the two Penman boilers in boiler house, with oldbury chain-grate automatic stoker partly retracted. |
1/6/1989 |
Item Level |
|
|
On-line Digital Images |
SC 2591095 |
|
Interior.
View on top floor of No.1 shaft tower showing winding engines with electric motor, gearbox and cable drum of the 1A winder in foreground (with 1B behind). The two winders are equipped with 14-tonne skips, and are together designed to lift 430 tonnes of coal per hour. The counterweights have rope guides. |
1/6/1998 |
Item Level |
|
|
On-line Digital Images |
SC 2591096 |
|
General view from NE, from top of no.2 winding tower of coal-stocking ground, with S end of pitead baths (right) and weighbridge (centre left). |
1/6/1998 |
Item Level |
|
|
On-line Digital Images |
SC 2591097 |
|
General view from SW, from top of no.1 winding tower of stores, covered conveyors (taking coal to coal preparation plant), mine compound, and railway sidings control room. |
1/6/1989 |
Item Level |
|
|
On-line Digital Images |
SC 2591098 |
|
View from top of no.1 winding tower, looking N, of winding tower no.2. Winding tower built of re-inforced concrete was used to wind men and materials using a tower mounted, geared, A.C. multi-rope friction winder with cage and counterweight which was manually controlled with dynamic braking. |
1/6/1989 |
Item Level |
|
|
On-line Digital Images |
SC 2591099 |
|
General view view no.2 Winding Tower (South) showing (foreground, left to right), fanhouse and stores, and (background, left to right), open electricity substation, electricity substation building and compressor house. |
1/6/1989 |
Item Level |
|
|
On-line Digital Images |
SC 2591100 |
|
Monktonhall Colliery: general view from the top of no.2 winding tower looking S, showing (left to right) covered belt conveyors, rapid loading surface bunker; (in distance) coal preparation plant, settling ponds; (foreground) No.1 winding tower and boilerhouse. |
1/6/1989 |
Item Level |
|
|
On-line Digital Images |
SC 2591101 |
|
General view from top of no.2 winding tower of workshops, lamp room and office buildings, from E. |
1/6/1989 |
Item Level |
|
|
On-line Digital Images |
SC 2591102 |
|
General view from (NE) top of No. 2 winding tower of (left to right) pithead baths and canteen, with overhead walkway to office, workshop and lamp room buildings. Also visible is a large car park for employees, and (background, left) part of the coal-stocking ground. |
1/6/1989 |