Aerial view. On-line Digital Images SC 1680506 RCAHMS Aerial Photography Aerial view. 1991 Item Level
Aerial view. On-line Digital Images SC 1680507 RCAHMS Aerial Photography Aerial view. 1991 Item Level
Aerial view. On-line Digital Images SC 1680508 RCAHMS Aerial Photography Aerial view. 1991 Item Level
Aerial view. On-line Digital Images SC 1680509 RCAHMS Aerial Photography Aerial view. 1991 Item Level
Aerial view. On-line Digital Images SC 1680510 RCAHMS Aerial Photography Aerial view. 1991 Item Level
Zipped folder containing field survey photographs taken by team A, Borders Railway Project On-line Digital Images DP 323342 Records of CFA Archaeology Ltd, archaeologists, Musselburgh, East Lothian, Scotland Zipped folder containing field survey photographs taken by team A, Borders Railway Project 1/3/2009 Item Level
General view from SW, showing offices (left) and baths (right). No.2 shaft winding tower (left) and no.1 shaft winding towr (right) are in the background. On-line Digital Images SC 2591092 General view from SW, showing offices (left) and baths (right). No.2 shaft winding tower (left) and no.1 shaft winding towr (right) are in the background. 1/6/1989 Item Level
Interior.
General view on top floor of No. 1 shaft tower showing winding engines, with (right to left) the electric motor, gearbox and cable drum of the 1 B winder.  Each of the two winders is equipped with 14-tonne skips and are together designed to lift 430 tonnes of coal per hour.  The counterweights have rope guides. On-line Digital Images SC 2591093 Interior. General view on top floor of No. 1 shaft tower showing winding engines, with (right to left) the electric motor, gearbox and cable drum of the 1 B winder. Each of the two winders is equipped with 14-tonne skips and are together designed to lift 430 tonnes of coal per hour. The counterweights have rope guides. 1/6/1989 Item Level
Interior.
Detail of one of the two Penman boilers in boiler house, with oldbury chain-grate automatic stoker partly retracted. On-line Digital Images SC 2591094 Interior. Detail of one of the two Penman boilers in boiler house, with oldbury chain-grate automatic stoker partly retracted. 1/6/1989 Item Level
Interior.
View on top floor of No.1 shaft tower showing winding engines with electric motor, gearbox and cable drum of the 1A winder in foreground (with 1B behind). The two winders are equipped with 14-tonne skips, and are together designed to lift 430 tonnes of coal per hour. The counterweights have rope guides. On-line Digital Images SC 2591095 Interior. View on top floor of No.1 shaft tower showing winding engines with electric motor, gearbox and cable drum of the 1A winder in foreground (with 1B behind). The two winders are equipped with 14-tonne skips, and are together designed to lift 430 tonnes of coal per hour. The counterweights have rope guides. 1/6/1998 Item Level
General view from NE, from top of no.2 winding tower of coal-stocking ground, with S end of pitead baths (right) and weighbridge (centre left). On-line Digital Images SC 2591096 General view from NE, from top of no.2 winding tower of coal-stocking ground, with S end of pitead baths (right) and weighbridge (centre left). 1/6/1998 Item Level
General view from SW, from top of no.1 winding tower of stores, covered conveyors (taking coal to coal preparation plant), mine compound, and railway sidings control room. On-line Digital Images SC 2591097 General view from SW, from top of no.1 winding tower of stores, covered conveyors (taking coal to coal preparation plant), mine compound, and railway sidings control room. 1/6/1989 Item Level
View from top of no.1 winding tower, looking N, of winding tower no.2. Winding tower built of re-inforced concrete was used to wind men and materials using a tower mounted, geared, A.C. multi-rope friction winder with cage and counterweight which was manually controlled with dynamic braking. On-line Digital Images SC 2591098 View from top of no.1 winding tower, looking N, of winding tower no.2. Winding tower built of re-inforced concrete was used to wind men and materials using a tower mounted, geared, A.C. multi-rope friction winder with cage and counterweight which was manually controlled with dynamic braking. 1/6/1989 Item Level
General view view no.2 Winding Tower (South) showing (foreground, left to right), fanhouse and stores, and (background, left to right), open electricity substation, electricity substation building and compressor house. On-line Digital Images SC 2591099 General view view no.2 Winding Tower (South) showing (foreground, left to right), fanhouse and stores, and (background, left to right), open electricity substation, electricity substation building and compressor house. 1/6/1989 Item Level
Monktonhall Colliery: general view from the top of no.2 winding tower looking S, showing (left to right) covered belt conveyors, rapid loading surface bunker; (in distance) coal preparation plant, settling ponds; (foreground) No.1 winding tower and boilerhouse. On-line Digital Images SC 2591100 Monktonhall Colliery: general view from the top of no.2 winding tower looking S, showing (left to right) covered belt conveyors, rapid loading surface bunker; (in distance) coal preparation plant, settling ponds; (foreground) No.1 winding tower and boilerhouse. 1/6/1989 Item Level
General view from top of no.2 winding tower of workshops, lamp room and office buildings, from E. On-line Digital Images SC 2591101 General view from top of no.2 winding tower of workshops, lamp room and office buildings, from E. 1/6/1989 Item Level
General view from (NE) top of No. 2 winding tower of (left to right) pithead baths and canteen, with overhead walkway to office, workshop and lamp room buildings.  Also visible is a large car park for employees, and (background, left) part of the coal-stocking ground. On-line Digital Images SC 2591102 General view from (NE) top of No. 2 winding tower of (left to right) pithead baths and canteen, with overhead walkway to office, workshop and lamp room buildings. Also visible is a large car park for employees, and (background, left) part of the coal-stocking ground. 1/6/1989 Item Level