|
Photographs and Off-line Digital Images |
C 38906 |
|
Elevated view from S of DZ2 (Sieving & De-lumping), showing construction details, including concrete walls, compartments, surrounding earth baffle (L) and chain roof cover to catch fragments of machinery in the event of an explosion |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38905 |
|
Elevated view of Tube Shop from SE, with Chemical Plant (DD1) to R |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38904 |
|
Elevated view from NNW showing network of wooden connecting gangways, and Drying Stoves (DN7, 8, 9 & 10) |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38903 CN |
|
View from W of covered wooden gangways linking Wet Magazine DX2 (L) with Drying Stove DS3 (R), and Sieving & De-lumping DZ2 (far R) |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38902 |
|
View from W of covered wooden gangways linking Wet Magazine DX2 (L) with Drying Stove DS3 (R), and Sieving & De-lumping DZ2 (far R) |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38901 |
|
View from N of DV1, former Boot End building within which employees exchanged their shoes for safe footwear, thereafter progressing to their place of work through the network of covered gangways |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38892 CN |
|
View from NNW of wooden gangways connecting Detonator Filling Buildings with neighbouring magazines |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38891 |
|
View from NNW of wooden gangways connecting Detonator Filling Buildings with neighbouring magazines |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38890 CN |
|
View from N of wooden gangways and N side of DL3 (Detonator Filling Building) |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38889 |
|
View from N of wooden gangways and N side of DL3 (Detonator Filling Building) |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38888 |
|
View along Main Corridor no 3, one of a network of covered gangways linking different buildings within the Detonator Dep't. Features of the gangways include the wooden planking protecting the side walls from bashes by bogies; the non-conductive Veitchie floor; and a fire drenching system (sprinklers) operated by an overhead cable |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38887 |
|
DF1, Detonator Loading: view along main passage, showing sequence of compartments housing detonator loading and pressing processes, each separated by concrete blast walls |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38886 |
|
DF1, Detonator Loading: detail of indicator wheel and sand-timers outside compartment containing the "Rumbler", and flame-proof electric switch |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38885 |
|
DF1, Detonator Loading: detail of the "Rumbler", a detonator cleaning machine |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38941 |
|
DD1, Chemical Plant, producing primary charge for detonators: view of Lead Azide (GAM) Washing & Sieving Compartment, with transport bogie |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38940 |
|
DD1, Chemical Plant, producing primary charge for detonators: view of Lead Styphnate Precipitation Room (also used for LMNR), on ground floor (behind blast wall) |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38939 |
|
DD1, Chemical Plant, producing primary charge for detonators: view of Lead Azide (GAM) Precipitation Room "A" (one of two), on ground floor (behind blast wall) |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38938 |
|
DD1, Chemical Plant, producing primary charge for detonators: view of Lead Nitrate control area on ground floor, with two Mariotte bottles (each 32 litres) on upper platform |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38937 |
|
DD1, Chemical Plant, producing primary charge for detonators: view of Magnesium Syphnate Compartment on upper floor |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38936 |
|
DD1, Chemical Plant, producing primary charge for detonators: view of Lead Nitrate Compartment on upper floor, with Joe Sweeney |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38935 |
|
DD1, Chemical Plant, producing primary charge for detonators: view of Sodium Azide Compartment on upper floor, with Joe Sweeney |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38934 |
|
DL4, Electrofuse Track Assembly: view of Track No 6, one of 8 automatic electrofuse assembly machines |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38933 |
|
DL5, Electrofuse Assembly: detail of Plug-cutting machine, with examples of cut plugs |
1995 |
Item Level |
|
|
Photographs and Off-line Digital Images |
C 38932 CN |
|
DL5, Electrofuse Assembly: detail of Ann Anderson at Position 3 in Compartment 6, operating a hand assembly machine |
1995 |
Item Level |
|