Construction
Date 1973
Event ID 962659
Category Building History
Type Construction
Permalink http://canmore.org.uk/event/962659
This bridge, the third at this site, carries the A836 road across the Kyle of Sutherland.It was built in 1973.
Designed by A A Cullen Wallace of Crouch and Hogg.
MAin Contractor, William Tawse (Nort Region) Ltd.
Structural Steelwork, Redpath, Dorman Long (Contracting) Ltd
R PAxton and J Shipway, 2007.