Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Field Visit

Date September 2004

Event ID 550119

Category Recording

Type Field Visit

Permalink http://canmore.org.uk/event/550119

A desk-based assessment and walkover survey were undertaken in September 2004 for a new water main. Two previously unrecorded clearance cairns were noted. A kiln, a building and an enclosure were noted as forming part of Caolishie township (NC51SW 8).

Full report lodged with Highland SMR and the NMRS.

Sponsor: Halcrow Group Ltd for Scottish Water.

S Farrell 2004

People and Organisations

References