Accessibility

Font Size

100% 150% 200%

Background Colour

Default Contrast
Close Reset

Interior. Main building, First Floor. Wing D. Second phase extension.The structural steel visible is part of the rubber footwear production line installed by Gates in the 1990s. the windows have been ...

DP 102713

Description Interior. Main building, First Floor. Wing D. Second phase extension.The structural steel visible is part of the rubber footwear production line installed by Gates in the 1990s. the windows have been replaced.

Date 27/7/2011

Collection Records of the Royal Commission on the Ancient and Historical Monuments of Scotland (RCAHMS), Edinbu

Catalogue Number DP 102713

Category On-line Digital Images

Permalink http://canmore.org.uk/collection/1242047

File Format (TIF) Tagged Image File Format bitmap

Collection Hierarchy - Item Level

Collection Level (551 1) Records of the Royal Commission on the Ancient and Historical Monuments of Scotland (RCAHMS), Edinburgh, Scotland

Group Level (551 1/4) National Survey Programmes

>> Sub-Group Level (551 1/4/9) Industrial Survey Programme

>>> Item Level (DP 102713) Interior. Main building, First Floor. Wing D. Second phase extension.The structural steel visible is part of the rubber footwear production line installed by Gates in the 1990s. the windows have been replaced.

People and Organisations

Events

Attribution & Licence Summary

Attribution: © Crown Copyright: HES

Licence Type: Full

You may: copy, display, store and make derivative works [eg documents] solely for licensed personal use at home or solely for licensed educational institution use by staff and students on a secure intranet.

Under these conditions: Display Attribution, No Commercial Use or Sale, No Public Distribution [eg by hand, email, web]

Full Terms & Conditions and Licence details

MyCanmore Text Contributions