Interior. Main building, First Floor. Wing D. Second phase extension.The structural steel visible is part of the rubber footwear production line installed by Gates in the 1990s.
DP 102712
Description Interior. Main building, First Floor. Wing D. Second phase extension.The structural steel visible is part of the rubber footwear production line installed by Gates in the 1990s.
Date 27/7/2011
Collection Records of the Royal Commission on the Ancient and Historical Monuments of Scotland (RCAHMS), Edinbu
Catalogue Number DP 102712
Category On-line Digital Images
Permalink http://canmore.org.uk/collection/1242046
File Format (TIF) Tagged Image File Format bitmap
Attribution: © Crown Copyright: HES
Licence Type: Full
You may: copy, display, store and make derivative works [eg documents] solely for licensed personal use at home or solely for licensed educational institution use by staff and students on a secure intranet.
Under these conditions: Display Attribution, No Commercial Use or Sale, No Public Distribution [eg by hand, email, web]